Table 34 - Natural Gas (ft
3
/hr) Maximum Piping Capacities
Specific Gravity = 0.6, Supply Pressure ≤ 0.5 psi, Pressure Drop = 0.5” w.c.
Pipe Size
Length of Pipe
20 ft
50 ft.
100 ft.
150 ft.
200 ft.
1/2”
120
73
50
40
35
3/4”
250
151
103
84
72
1”
465
285
195
160
135
1-1/4”
950
580
400
325
280
1-1/2”
1460
900
620
500
430
2”
2750
1680
1150
950
800
2-1/2”
4350
2650
1850
1500
1280
Table 35 - Propane (kBtu/hr) Maximum Piping Capacities
Specific Gravity = 1.52, Supply Pressure = 11” w.c., Pressure Drop, 0.5” w.c.
Pipe Size
Length of Pipe
20 ft
50 ft.
100 ft.
150 ft.
200 ft.
1/2”
189
114
78
63
55
3/4”
393
237
162
132
112
1”
732
448
307
252
213
1-1/4”
1496
913
630
511
440
1-1/2”
2299
1417
976
787
675
2”
4331
2646
1811
1496
1260
Do not use gas piping smaller than unit gas
connections. Natural gas pipe runs longer
than 20 feet and propane gas pipe runs longer
than 50 feet may require a larger supply pipe
than the unit connection size. Some utility
companies may also require pipe sizes larger
than the minimum sizes listed.
Piping Sizing Examples
A 100 ft pipe run is needed for a 1080 MBH
natural gas heater. The natural gas has a
rating of 1000 Btu/ft
3
and a specific gravity
of 0.6 (Obtain these values from the local gas
supplier.)
BTU
ft
MBH
1000
1080
3
1080 ft
3
/hr
From the natural gas maximum capacities
table, at 100 ft and 1080 ft
3
/hr the required
minimum pipe size is 2”.
A 100 ft pipe run is needed for a 270 MBH
propane gas heater.
270
MBH
= 270 kBtu/hr
From the propane gas maximum capacities
table, at 100 ft and 270 kBtu/hr the required
minimum pipe size is 1”.
Inlet and Manifold Pressures
For natural gas units, the minimum inlet gas
pressure to the unit is 6” w.c. and maximum
inlet gas pressure to the unit is 10.5” w.c. For
propane units, the minimum
inlet gas
pressure to the unit is 11” w.c. and the
maximum inlet gas pressure to the unit is 13”
w.c. A field provided 1/8” NPT pressure tap
is required to be installed in the piping jus t
upstream of the shutoff valve for test gage
connection to allow checking of the gas
supply pressure at the unit.
Summary of Contents for RN Series
Page 2: ......
Page 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Page 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Page 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Page 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Page 36: ...36 Figure 9 Steel Mounting ...
Page 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Page 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Page 129: ...Maintenance Log E Coated Coil ...