
53
Maintenance Log
This log must be kept with the unit. It is the responsibility of the owner and/or
maintenance/service contractor to document any service, repair or adjustments. AAON Service
and Warranty Departments are available to advise and provide phone help for proper operation
and replacement parts. The responsibility for proper startup, maintenance and servicing of the
equipment falls to the owner and qualified licensed technician.
Entry Date
Action Taken
Name/Tel.
Summary of Contents for F1-060
Page 31: ...31 ...
Page 36: ...36 Figure 8 Heat Pump Piping Diagram with Indoor Unit above Outdoor Unit ...
Page 37: ...37 Figure 9 Heat Pump Piping Diagram with Outdoor Unit above Indoor Unit ...
Page 40: ...40 Thermostat Installation and Wiring Figure 12 2 Stage Cooling with Electric Heat ...
Page 41: ...41 Figure 13 2 Stage Cooling with Heat Pump and Electric Heat ...
Page 42: ...42 Figure 14 2 Stage Cooling and Electric Heat with Hot Gas Reheat and Humidistat ...
Page 43: ...43 Figure 15 Main Control Board for Units Equipped with Modulating Hot Gas Reheat ...
Page 45: ...45 Figure 17 5kW Electric Heat ...
Page 46: ...46 Figure 18 10 kW Electric Heat ...
Page 47: ...47 Figure 19 15 kW Electric Heat ...
Page 48: ...48 Figure 20 20 kW Electric Heat ...
Page 49: ...49 Figure 21 25 kW Electric Heat ...
Page 55: ...55 ...