Installation
32
Instruction manual BFC
3
is
Appliance with parallel flue gas discharge material
The longest pipe must be used to check the maximum length. In this case, the
chimney pipe is the longest. This is 35 metres. This 35 metres is the sum of pipe
sections 1, 2, 3, 4 and 5. The length of the transition piece can be ignored. The
total number of bends used
in the flue gas discharge and air supply
is 8. The
bend in the transition piece can be ignored. According to the table, 2.4 metres
per bend must be added. This brings the total pipe length to:
(2.4 x 8) + 35 = 19.2 + 35 = 54.2m.
This is less than the maximum length of 60 metres stated in the table. The
installation therefore fulfils the requirements.
3.10 Electrical
connection
Warning
The installation should be carried out by an authorised installation engineer,
in compliance with general and local regulations
(1.3 "Regulations")
.
3.10.1
Introduction
Topics covered in this paragraph:
•
Preparation
;
•
Connecting the mains voltage
;
1
2
3
4
5
IMD-0285 R2
Summary of Contents for cyclone BFC - 80
Page 2: ...www aosmithinternational com your installer...
Page 4: ...4 Instruction manual BFC gis...
Page 8: ...Table of contents 8 Instruction manual BFC...
Page 12: ...Introduction 12 Instruction manual BFC 1 gis...
Page 27: ...Instruction manual BFC 27 is Types of appliances IMD 0468 R0 C43 C13 C53 B23 C33...
Page 46: ...Draining 46 Instruction manual BFC 6 gis...
Page 52: ...Status of the appliance 52 Instruction manual BFC 8 gis...
Page 56: ...Shutting down 56 Instruction manual BFC 10 gis...
Page 82: ...Maintenance frequency 82 Instruction manual BFC 14 is...
Page 92: ...Appendices 92 Instruction manual BFC 17 is...
Page 94: ...Instruction manual BFC 94...