INSTALLATION

Installation of the Fixed Anchorage Point must be performed by competent person(s)

2

 familiar with the 

Fixed Anchorage Point. The following guidelines must be read and understood by all members of the installation 

team:

PRIOR TO INSTALLATION:

 Plan your fall protection system. Consider all factors that will affect safety during 

use of the equipment. Select a suitable strength structure that will prove overall safety and proper loading 

strength. The Fixed Anchorage Point installation should include the following considerations:

•  Height above the work surface.

•  Clearance to obstacles.

•  Work area hazards.

•  Type of fall protection system desired/needed.

•  PPE to be used in the system.

IMPORTANT:

 If you have questions on the use, care, or suitability of this equipment for your application, 

contact Capital Safety. Modification and alteration of the Fixed Anchorage Point is not permitted without prior 

agreement from Capital Safety.

WARNING:

 When working at height to install the Fixed Anchorage Point, use fall protection incorporating 

anchorage independent of the anchorage you are installing.

ANCHORAGE STRUCTURE:

 The structure to which the Fixed Anchorage Point is mounted must be capable of 

sustaining 12 kN of force in the anticipated direction(s) of loading (see Figure 2). Each Fixed Anchorage Point 

location must be capable of sustaining this load.

PLANE OF ANCHORAGE SURFACE:

  If the Fixed Anchorage Point is to be installed on a surface that is not 

perpendicular to the user walking level (e.g., curved or inclined roof, narrow ledge at head height), or a curved 

surface perpendicular to the user walking level (e.g., silo or vat), consult Capital Safety prior to installation.

INSTALLATION HEIGHT:

 The Fixed Anchorage Point may be installed at any practical height above the work 

surface.

RESTRAINT SYSTEMS:

 Where possible, installations should be designed as a restraint application (see 

Figure 1). Restraint systems prevent the user from reaching a position where a fall can occur; therefore, no free-

fall is possible.

FALL ARREST SYSTEMS:

 When the Fixed Anchorage Point is used in a Fall Arrest system, it is important to 

consider the following factors during design:

•  Anchorage Point 

- Mount the anchor as high as possible in relation to the user. This minimizes possible free 

fall, making rescue easier and less distressing for the victim. Avoid anchor locations that increase the chance 

of swing fall. Swing falls occur when the anchorage point is not directly above the point where a fall occurs. 

The force of striking an object in a swing fall may cause serious injury or death. Minimize swing falls by 

working as close to the anchorage point as possible.

•  Anchor Orientation

 - The Fixed Anchorage Point must be correctly oriented to support the loads applied by 

the system (see Figure 2).

•  Hazards

 - The work area and path below should be free of any hazards (vehicles, fences, balconies, 

pedestrians, water/chemicals, etc.) that could injure the user or others if a fall occurs.

FASTENING REQUIREMENTS:

 The Fixed Anchorage Point is installed with M12 fasteners:

•  (Figure 3) Install in metal with an M12  A2 or A4 Class Stainless Steel Bolt.
•  (Figure 4) Install in masonry with an M12 Adhesive Anchoring System (Hilti HIT-HY 150 or equivalent). Follow 

the manufacturer’s instructions for installing the Adhesive Anchoring system.

•  A Locking Nut and Washer must be used in all installations. All fasteners should be tightened to the fastener 

manufacturer’s torque recommendations.

•  Attach the included Installation Label to the Fixed Anchorage Point after installation.

PROOF LOAD TESTING:

 After installation, the Fixed Anchorage Point must be proof loaded. Using a tension 

tester, apply a 5kN load for at least 15 seconds in a direction perpendicular to the mating surface. There should be 

no pull out from the installation structure or deformation of the Fixed Anchorage Point eye.

2  Competent Person:

 An individual designated by the employer to be responsible for the immediate supervision, implementation, and monitoring of the employer’s 

managed fall protection program who, through training and knowledge, is capable of identifying, evaluating, and addressing existing and potential fall hazards, and who 

has the employer’s authority to take prompt corrective action with regard to such hazards.

Summary of Contents for PROTECTA AM211

Page 1: ...duct Services Kitemark Court Davy Avenue Knowlhill Milton Keynes MK5 8PP UK 3M 2022 FORM NO 5903808 REV B Fixed Anchorage Point Model Number AM211 USER INSTRUCTION MANUAL FIXED ANCHORAGE POINT This ma...

Page 2: ...3 4 5 A E B C D...

Page 3: ...roduct is part of a fall protection system Installers and users must read and follow the manufacturer s instructions for each component of the system Alterations or misuse of this equipment or failure...

Page 4: ...STEMS When the Fixed Anchorage Point is used in a Fall Arrest system it is important to consider the following factors during design Anchorage Point Mount the anchor as high as possible in relation to...

Page 5: ...oint see cover photo All markings should be present and legible If markings are not present or are illegible remove the anchor from service and replace X X Inspect the fastener s and structural materi...

Page 6: ...ame Signature Competent Person Name Signature Competent Person Name Signature Competent Person Name Signature Competent Person Name Signature Competent Person Name Signature Competent Person Name Sign...

Page 7: ...et les utilisateurs doivent lire et suivre les instructions du fabricant et ce pour chaque composant du syst me utilis Toute modification ou utilisation inappropri e de cet quipement ou le non respect...

Page 8: ...rtant de prendre en consid ration les facteurs suivants au cours de l installation Point d ancrage fixez l ancrage aussi haut que possible par rapport l utilisateur Cela permet de minimiser les ventue...

Page 9: ...lisibles retirez l ancrage du service et remplacez le X X Inspectez les l ments de fixation et les mat riaux de la structure afin de d tecter tous les d g ts pouvant ventuellement affecter les perform...

Page 10: ...ISATION DATE D INSPECTION POINTS D INSPECTION NOT S MESURE CORRECTIVE ENTRETIEN EFFECTU Approuv par Approuv par Approuv par Approuv par Approuv par Approuv par Approuv par Approuv par Approuv par Appr...

Page 11: ...un sistema de protecci n contra ca das Los instaladores y usuarios deben leer y seguir las instrucciones del fabricante en relaci n con cada componente del sistema Si se altera o se hace un uso indebi...

Page 12: ...se utiliza en un sistema de detenci n de ca das es importante tener en cuenta los siguientes factores durante el dise o Punto de anclaje monte los anclajes lo m s alto posible en relaci n con el usua...

Page 13: ...ones en el punto de anclaje fijo ver foto de la portada Todas las indicaciones deben estar presentes y ser legibles Si las indicaciones no est n presentes o son ilegibles quite el anclaje de servicio...

Page 14: ...INSPECCI N OBSERVACIONES DE LA INSPECCI N ACCI N CORRECTORA MANTENIMIENTO REALIZADO Aprobado por Aprobado por Aprobado por Aprobado por Aprobado por Aprobado por Aprobado por Aprobado por Aprobado por...

Page 15: ...zungen oder Tod f hren Dieses Produkt ist Teil eines Absturzsicherungssystems Monteure und Anwender m ssen die Herstelleranweisungen f r jede Komponente des gesamten Systems lesen und befolgen nderung...

Page 16: ...ankerungspunkt in einem Absturzsicherungssystem eingesetzt m ssen beim Entwurf des Systems folgende Faktoren unbedingt ber cksichtigt werden Verankerungspunkt Installieren Sie die Verankerung so hoch...

Page 17: ...to Alle Markierungen m ssen vorhanden und lesbar sein Wenn Markierungen nicht vorhanden oder unleserlich sind die Verankerung entfernen und ersetzen X X berpr fen Sie die Befestigungselemente und das...

Page 18: ...ON BEMERKTE M NGEL ABHILFEMASSNAHME DURCHGEF HRTE WARTUNGSARBEITEN Genehmigt von Genehmigt von Genehmigt von Genehmigt von Genehmigt von Genehmigt von Genehmigt von Genehmigt von Genehmigt von Genehmi...

Page 19: ...are lesioni o decesso Questo prodotto fa parte di un sistema di protezione anticaduta Per ogni componente del sistema gli installatori e gli utenti sono tenuti a leggere e a seguire le istruzioni del...

Page 20: ...sistema di arresto caduta durante la progettazione importante tenere in considerazione i fattori riportati di seguito Punto di ancoraggio montare il sistema di ancoraggio il pi in alto possibile risp...

Page 21: ...opertina Tutti i contrassegni devono essere presenti e leggibili Se i contrassegni non sono presenti o sono illeggibili rimuovere dal servizio e sostituire il dispositivo di ancoraggio X X Ispezionare...

Page 22: ...ISPEZIONE ELEMENTI DI ISPEZIONE ANNOTATI AZIONE CORRETTIVA MANUTENZIONE ESEGUITA Approvato da Approvato da Approvato da Approvato da Approvato da Approvato da Approvato da Approvato da Approvato da A...

Page 23: ...kers moeten de instructies van de fabrikant voor elk component van het systeem lezen en opvolgen Deze apparatuur wijzigen er misbruik van maken of zich niet aan deze instructies houden kan ernstig let...

Page 24: ...ruikt in een valstopsysteem is het belangrijk om in de ontwerpfase rekening te houden met de volgende factoren Verankeringspunt Monteer het anker zo hoog mogelijk ten opzichte van de gebruiker Dit min...

Page 25: ...dan het verankeringspunt uit bedrijf en vervang het X X Controleer de bevestigingsbout en en het structurele materiaal op schade die de houdkracht van de verankeringen kan aantasten Controleer het om...

Page 26: ...RIGERENDE ACTIE UITGEVOERD ONDERHOUD Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeurd door Goedgekeur...

Page 27: ...smr Tento produkt je s as ou syst mu na ochranu pred p dom In tala n person l a pou vatelia musia dodr iava pokyny v robcu t kaj ce sa ka d ho komponentu syst mu prava alebo nespr vne pou vanie tohto...

Page 28: ...P DU Ke sa pevn kotviaci bod pou ije v syst me na zachytenie p du pri navrhovan je d le it vzia do vahy nasleduj ce faktory Kotviaci bod Namontujte kotvu tak vysoko ako je to len mo n vo vz ahu k pou...

Page 29: ...fiu na titulnej strane V etky ozna enia musia by pr tomn a itate n Ak ozna enia nie s k dispoz cii alebo s ne itate n vyra te kotvu z prev dzky a vyme te ju X X Skontrolujte po kodenie upev ovac ch pr...

Page 30: ...ej osoby Meno podpis kompetentnej osoby Meno podpis kompetentnej osoby Meno podpis kompetentnej osoby Meno podpis kompetentnej osoby Meno podpis kompetentnej osoby Meno podpis kompetentnej osoby Meno...

Page 31: ...personligt fallskyddssystem Installat rer och anv ndare m ste f lja tillverkarens instruktioner f r varje komponent i systemet ndringar eller felaktigt bruk av utrustningen eller underl telse att f l...

Page 32: ...den fasta f rankringen anv nds i ett fallstoppssystem r det viktigt att t nka p f ljande faktorer vid utformningen F rankringspunkt Montera ankaret s h gt som m jligt i f rh llande till anv ndaren De...

Page 33: ...ra l sbara Om m rkningar saknas eller r ol sliga ska f rankringen tas bort och ers ttas X X Inspektera f stanordningen och strukturen f r att se om det finns skador som kan p verka f rankringspunktens...

Page 34: ...ONTROLL DATE KOINSPECTION PUNKTER NOTERAT R TTELSER UNDERH LL SOM UTF RS Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk nd av Godk n...

Page 35: ...3M reparar o sustituir los productos que considere que tienen un defecto de fabricaci n de mano de obra o materiales 3M se reserva el derecho a solicitar la devoluci n del producto a sus instalaciones...

Page 36: ...4 97 10 00 10 Fax 33 04 93 08 79 70 informationfallprotection mmm com Australia New Zealand 137 McCredie Road Guildford Sydney NSW 2161 Australia Toll Free 1800 245 002 AUS Toll Free 0800 212 505 NZ 3...

Reviews: