13.10 Box Drive Belt Tension
The two (2) continuously moving drive belts convey boxes through the tape applying mechanism.
The box drive belts are powered by an electric gear motor.
Tension adjustment of these belts may be required during normal operation (for Belt Tension Adjustment - refer to
Section 11 / Set-Up and Adjustments
). Belt tension must be adequate to positively move the box through the
machine and the belts should run fully on the surface of the pulleys at each end of the frame. The idler pulleys on
the infeed end are adjusted in or out to provide proper belt tension. Each belt is adjusted separately.
Belt tension is obtained by tightening the adjustment screw so that a moderate pulling force of 3.5kg [7lbs.]
applied at the mid span, as shown in
Figure 13-7
, will defl ect the belt 25mm [1 inch]. This will assure positive
contact between the belt and the drive pulley on the discharge end of the drive assembly.
Figure 13-7 Box Drive Belt Tension Adjustment
•
To reduce the risk associated with mechanical and electrical hazards:
- Turn electrical supply off and disconnect before performing any adjustments,
maintenance or servicing the machine or taping heads.
Discharge End
Infeed End
3.5kg (7lbs) Pull Force
with 25mm (1 inch) at Mid span
Box Drive Belt
WARNING
2009 February
200a-NA
13.9 Drive Pulley Rings
Before installing a new belt, check the orange plastic
drive pulley rings for wear. If torn, broken, or worn
smooth, replace the rings
(Figure 13-6).
Figure 13-6
(Belt Tension continued on next page)
Summary of Contents for 3M-Matic AccuGlide 3 200a
Page 4: ...THIS PAGE IS BLANK ...
Page 6: ...THIS PAGE IS BLANK ...
Page 8: ...8 THIS PAGE IS BLANK ...
Page 10: ...THIS PAGE IS BLANK ...
Page 46: ...34 THIS PAGE IS BLANK ...
Page 48: ...36 THIS PAGE IS BLANK ...
Page 49: ...37 16 TECHNICAL DIAGRAMS 16 1 Electric Diagram 200a NA 2009 February ...
Page 50: ...38 THIS PAGE IS BLANK ...
Page 52: ...40 THIS PAGE IS BLANK ...
Page 54: ...42 THIS PAGE IS BLANK ...
Page 62: ...50 2009 February 200a NA 3 11 14 13 15 8 9 4 2 1 7 6 5 6 6 10 1 2 12 10 Figure 2798 200a ...
Page 72: ...60 14 12 5 5 6 8 9 7 7 6 3 13 11 1 2 10 4 8 8 8 2009 February 200a NA Figure 5593 200a ...
Page 76: ...64 THIS PAGE IS BLANK ...
Page 78: ......
Page 80: ...THIS PAGE IS BLANK ...
Page 82: ...THIS PAGE IS BLANK ...
Page 86: ...2 THIS PAGE IS BLANK ...
Page 91: ...7 AccuGlide 3 Taping Head 2 2009 February Figure 2 1 Dimensional Drawing Specifications ...
Page 122: ...38 THIS PAGE IS BLANK ...
Page 123: ...39 ...
Page 124: ...40 ...