25
12.3 Starting Production
After having adjusted the machine according to the
box dimensions (height-width), let the machine run
without cartons and check its safety devices. Then
start the working cycle.
12.4 Tape Replacement and Threading
See Manual 2: AccuGlide™ 3 High Speed 2 Inch
Taping Heads.
Press the
LATCHING EMERGENCY STOP BUTTON.
12.5 Box Size Adjustment
Repeat all the operations shown in
Section 11 - Set-Up and Adjustments.
12.6 Cleaning
Before carrying out any cleaning or maintenance
operation stop the machine by Pushing the OFF
switch on the main and disconnect the electric power
(Figure 12-3).
12-OPERATION
12.1 Operator's Correct Working Position and
Operational Flow (Figure 12-1).
Once the box has been fi lled, close its top fl aps and
push it between the top and bottom drive belts.
Always keep hands in position as shown in
Figure 12-2.
The box will be automatically sealed with adhesive
tape on the top and bottom box seams. Then the
box will be expelled on the exit conveyor.
12.8 Safety Devices Inspection
1 Taping units blade guard
2 Latching emergency stop button
3 STOP (OFF) main switch
Operator
Qualifi cations
1 Tape loading and threading
1
2 Tape web alignment
1
3 Adjustment of one way tension roller
1
4 Adjustment to box size (H and W)
1
5 Top fl ap compression rollers
1
6 Adjustment of tape applying spring
1
7 Conveyor bed height adjustment
1
8 Special Adjustment-Changing tape leg length 2
9 Special Adjustment-Column re-positioning
2
12.7 Table of Operation Adjustments -
12.2 Starting the Machine
Important:
Before starting the machine, verify that
no tools or other objects are on the conveyor bed.
Push the main switch ON after the EMERGENCY
BUTTON is released
(Figure 12-3).
2009 February
200a-NA
Figure 12-1
Figure 12-3
WARNING
Hand
Position
Figure 12-2
•
To reduce the risk associated with sharp
blade hazards:
−
Keep hands and fi ngers away from tape
cutoff blades under orange blade guards.
The blades are extremely sharp.
Summary of Contents for 3M-Matic AccuGlide 3 200a
Page 4: ...THIS PAGE IS BLANK ...
Page 6: ...THIS PAGE IS BLANK ...
Page 8: ...8 THIS PAGE IS BLANK ...
Page 10: ...THIS PAGE IS BLANK ...
Page 46: ...34 THIS PAGE IS BLANK ...
Page 48: ...36 THIS PAGE IS BLANK ...
Page 49: ...37 16 TECHNICAL DIAGRAMS 16 1 Electric Diagram 200a NA 2009 February ...
Page 50: ...38 THIS PAGE IS BLANK ...
Page 52: ...40 THIS PAGE IS BLANK ...
Page 54: ...42 THIS PAGE IS BLANK ...
Page 62: ...50 2009 February 200a NA 3 11 14 13 15 8 9 4 2 1 7 6 5 6 6 10 1 2 12 10 Figure 2798 200a ...
Page 72: ...60 14 12 5 5 6 8 9 7 7 6 3 13 11 1 2 10 4 8 8 8 2009 February 200a NA Figure 5593 200a ...
Page 76: ...64 THIS PAGE IS BLANK ...
Page 78: ......
Page 80: ...THIS PAGE IS BLANK ...
Page 82: ...THIS PAGE IS BLANK ...
Page 86: ...2 THIS PAGE IS BLANK ...
Page 91: ...7 AccuGlide 3 Taping Head 2 2009 February Figure 2 1 Dimensional Drawing Specifications ...
Page 122: ...38 THIS PAGE IS BLANK ...
Page 123: ...39 ...
Page 124: ...40 ...