![3DAeroventures Super Chipmunk Build Manual Download Page 51](http://html1.mh-extra.com/html/3daeroventures/super-chipmunk/super-chipmunk_build-manual_442111051.webp)
Step-by-Step Build Guide (cont’d)
3D
Aeroventures
N�v�r S�o� E�p�o�i�g� N�v�r S�o� Q�e�t�o�i�g� N�v�r S�o� P�a�i�g
- 5� -
Elevator Pushrod
2mm (or 2-56) Diameter Wire
with Threaded End
Scale 1:1
Side View
Rudder Pushrod
2mm (or 2-56) Diameter Wire
with Threaded End
Scale 1:1
Side View
Qty. 2 required