![3DAeroventures Super Chipmunk Build Manual Download Page 48](http://html1.mh-extra.com/html/3daeroventures/super-chipmunk/super-chipmunk_build-manual_442111048.webp)
3D
Aeroventures
N�v�r S�o� E�p�o�i�g� N�v�r S�o� Q�e�t�o�i�g� N�v�r S�o� P�a�i�g
- 4� -
Step-by-Step Build Guide (cont’d)
7.3.4 Hold both Elevators in place on the Horizontal Stabs and permanently
attach them both with the
1mm - 1.5mm O.D. x 550mm long carbon fiber
rod.
Alternatively, If you have trouble finding a 550mm long carbon fiber
rod you can use qty. 2, 275mm long rods. Insert one rod through Elev R4
and one through Elev L4 until they meet in the middle. Place a drop of CA
glue in the rod entry holes to prevent the rod from sliding out.
7.3.3 Slide the rudder onto the exposed tailwheel wire until it is fully seated.
Attach the Rudder to the Vert Stab with the 1mm - 1.5mm O.D. x 220mm
long carbon fiber rod. Place a drop of CA glue in the rod entry hole to
prevent the rod from sliding out.