![3DAeroventures Micro SportCam Build Manual Download Page 8](http://html1.mh-extra.com/html/3daeroventures/micro-sportcam/micro-sportcam_build-manual_442110008.webp)
Fuse 1 (11g)
Tire- TPE
(Total Landing Gear Weight 12g)
Main Gear Tire Hub 1 (PLA)
Main Gear Tire Hub 2 (PLA)
Fuse 2 (15g)
Fuse 3 (7g)
Horiz Stab L (2g)
Vert Stab (2g)
Canopy (5g)
Servo Tray (2g) (PLA)
Horiz Stab R (2g)
Main Gear Strut (PLA, ABS, or PETG)
3D
Aeroventures
N�v�r S�o� E�p�o�i�g� N�v�r S�o� Q�e�t�o�i�g� N�v�r S�o� P�a�i�g
- 8 -
Step 2. Fu Stabilizers Assembly
Tools and Materials Needed:
- Medium Bodied CA/Super Glue
- Accelerator for CA
- Sandpaper and/or Small Files
- Needle Nose Pliers for bending nose gear wire
Step-by-Step Build Guide (cont’d)
Printed Parts Needed (Tail Dragger Option):
Hardware Needed (links to recommended hardware on pg 4):
- 5mm O.D x 3mm Thick Rare Earth Magnets
for Removable Canopy
-
M3 x 0.5mm Thread x 15mm Long Screws
for Wheels (nylon preferred)
- 3mm O.D. x 400mm Long Carbon Fiber Tube
or Rod for fuselage cut to these lengths:
- 190mm Long (x2)
- 3mm O.D. (or 1/8” O.D) x 10mm Long Dowel Pins (cut from leftover carbon tube/rod)