Post-installation Checklist
27
Follow the parameters defined in Table 30 for binding cables with ties.
Post-installation
Checklist
After you install your Switch 8800, use the checklist in Table 31 to verify that your
switch operates correctly.
WARNING:
Confirm that you have turned off the power before checking your
installation. Improper connections can injure people or damage components of
the switch.
Table 30
Cable Binding Parameters
Cable Bundle Diameter
Space Between Bundles
10 mm (0.5in)
80 – 150 mm (3.5 – 6 in)
10 – 30 mm (.5 – 1.2 in)
150 – 200 mm (6 – 8 in)
30 mm (1.2 in)
200 – 300 mm (8 – 12 in)
Table 31
Installation Checklist
Item
Normal
Abnormal (Remarks)
Antistatic wrist strap
Console cable
Ground wire
Power cord
Fabric
I/O module
Fan frame
Power supply
Summary of Contents for 8800 SERIES
Page 28: ...28 CHAPTER 2 INSTALLING THE SWITCH 8800 ...
Page 34: ...34 CHAPTER 3 CONFIGURING THE SWITCH 8800 ...
Page 50: ...50 CHAPTER 5 MAINTAINING HARDWARE ...
Page 54: ...54 CHAPTER 6 TROUBLESHOOTING ...
Page 58: ...58 APPENDIX A SWITCH 8800 CABLES ...
Page 62: ...62 APPENDIX B OBTAINING SUPPORT FOR YOUR SWITCH 8800 ...