![2VV ALFA 85 Installation Manual Download Page 4](http://html.mh-extra.com/html/2vv/alfa-85/alfa-85_installation-manual_440024004.webp)
4
2VV.
Creating innovative solutions for you and your business since 1995.
Components Included
READ CAREFULLY!
•
If the ventilation unit was exposed to temperatures lo
-
wer than 0 ° C during transport, please unpack unit and
let it sit at room temperature for at least 2 hours before
connecting the unit in order to balance temperature in
-
side unit.
2. UNPACKING
2.1 PRODUCT INSPECTION
READ CAREFULLY!
•
Upon delivery, check the product packaging for possi
-
ble damage. In the event of damage to the packaging
notify the carrier. If no complaint is filed in a timely ma
-
nner, subsequent requests will not be considered.
•
Check whether the product is appropriate for your or
-
der. If the product type does not match, do not unpack
it and contact the supplier immediately.
•
After unpacking, check the status of the unit and all of
its components. If in doubt, contact the supplier.
•
Never use a damaged unit.
•
If you fail to unpack the unit immediately after its rece
-
ipt, it must be stored in dry rooms at temperatures from
+5 ° C to +35 ° C.
This product must be properly disposed of in accor
-
dance with local laws and regulations. The pro
-
duct contains batteries, so they must be recycled
or disposed of separately from household waste.
When the battery or the product reach the end of their
service life, contact your dealer or local authorities and
ask about recycling options. The separate collection and
recycling of your product and its battery will help to pre
-
serve natural resources and ensure that the product is
recycled in a manner that protects human health and the
environment.
Communication cable is not part of delivery and is
required for proper operation of unit.
Recommended cable type: UTP CAT5 class
1x
1x
1x