39
2VV.
Creating innovative solutions for you and your business since 1995.
READ CAREFULLY
Please check the following before first operati
-
on:
•
That the unit is mounted well to the support structure.
•
That the unit is closed correctly, and that ducts are pr
-
operly connected, rain-protection roof installed, and
that duct connections or other components are are not
in contact with any rotating or heating components
•
That the electrical wiring is connected correctly, inclu
-
ding grounding and protection against external activa
-
tion.
•
That all accessories are connected correctly.
•
That the condensate drain is connected correctly to the
discharge piping (for units with cooling).
•
That the connection is in compliance with instructions
in this manual.
•
That no tool or other object has been left inside the unit,
which could result in damage to the unit.
ATTENTION!
•
Any interventions or modifications to unit wiring are pro
-
hibited and may lead to warranty loss!
•
We recommendusing 2VV approved accessories only.
7.1 ACTIVATION
To activate the unit (Stand by mode), it is necessary to
turn the main switch on (ON= red OFF= green). After acti
-
vation, the display on the control panel lights up and data
download will start. After complete download of these
data, the unit is ready for operation.
7. FIRST OPERATION
0
1