2N TELEKOMUNIKACE a.s., www.2n.cz
41/106
Outdoor Installation Rules
Always connect button backlighting – it is used for heating.
The joint between the roof module and the wall must be filled with a waterproof
cement to prevent water in-leak (see Figure 2.5).
Water must not leak in along or around the cables.
Warning
Make sure that all the holes are filled with a waterproof material – top,
around the cables and screws - and that a side sealing is ensured.
Name Tag Material and Printing
Each
package includes a sheet of transparent foil for laser printing. Cut
2N IP Vario
®
the printed foil into pieces and insert the labels in the name plates. Do not use paper
to avoid water in-leak and paper damage.
Red arrows are printed on the name plate. Make sure that the text and the arrow do
not overlap. We recommend you to use a template (MS Word) available in section
Downloads for printing.
Flush Mounting
Follow the installation instructions included in the flush mounting box delivery.
Caution
The warranty shall not apply to product failures and defects caused by
improper installation (contrary to these instructions). The manufacturer
is neither liable for damages caused by theft within an area that is
accessible after the attached electric lock is switched. The product is not
designed as a burglar protection device except when used in
combination with a standard lock, which has the security function.
Summary of Contents for IP Vario
Page 1: ...www 2n cz 2N IP Vario Door Entry IP Intercom Installation Manual Version 2 12 ...
Page 20: ...2N TELEKOMUNIKACE a s www 2n cz 20 106 Part No 91378382W 2N Indoor Touch desk stand white ...
Page 45: ...2N TELEKOMUNIKACE a s www 2n cz 45 106 Description of Connectors PCB Versions 535v8 ...
Page 60: ...2N TELEKOMUNIKACE a s www 2n cz 60 106 ...
Page 75: ...2N TELEKOMUNIKACE a s www 2n cz 75 106 Connection ...
Page 92: ...2N TELEKOMUNIKACE a s www 2n cz 92 106 Incoming call Door opened unlocked ...