ZXR10 ZSR Hardware Installation Manual
à
Concrete drilling tools
Hydraulic pressure percussion drill, percussion drill bit and vacuum cleaner
à
Fastening tools
plus driver (M3~M6), philips screwdriver (M3~M6), socket wrench (M6~M19) and
ring wrench (M6~M19)
à
Measurement tools
Industrial horizontal ruler, rolled tape, ruler and angle square
à
Auxiliary tools
Brush, nippers, paper knife, bellows, electric iron, solder, ladder and forklift
à
Fitting tools
Sharp-nose pliers, diagonal pliers, vices, hand-held electric drill, file, handsaw,
crowbar, and rubber hammer
l
Common Instruments
Multimeter, 500V megohmmeter (used in insulation resistance measurement)
l
Special Tools
à
Optical multimeter, optical connector and tail fiber
à
Coaxial trunk self-loop cable
à
Coaxial cable installation tool
à
Earth resistance tester
à
Antistatic bracelet/ring
à
Wire stripper
à
Crimping pliers
3.7 Technical Document Preparation
Installation engineering personnels must take the following technical documents with them
for reference:
l
ZXR10 ZSR (V2.8.11) Intelligent Integrated Multi-Service Router Hardware
Installation Manual
l
ZXR10 ZSR (V2.8.11) Intelligent Integrated Multi-Service Router Hardware Manual
3-6
SJ-20110803091932-002|2011-08-30 (R2.0)
ZTE Proprietary and Confidential