COMPUTER-CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE
- 4-
3. Installation of the swing machine head
(2)
.
Fit hinge rubber to the hinge shaft, and fix the swing machine.
①
The flat pad , nut , followed by a fixed, pay attention
②
③
To prevent possible accidents caused by the full of the sewing machine,
perform the work by two persons or more when the machine is
(3)
.
1
2
1
2
3
3
4
4
4
5
A
A
6
7
8
6
7
8
A
to the locking nut
③
force, if twisted too tightly, then the shock result is
not satisfactory.
(1)
.
The oil plate with wood screws fixed in the corresponding position of the platen.
1、When handling sewing machine,
please hold A Department
2、After handling, please remove
the handle⑦ and rubber pad⑧,
fitted with rubber plug⑥
④
⑤
Содержание ZJ1900DSS
Страница 6: ...高速电子套结机 2 各部件名称 1 主机的名称 缝纫机机头 送布压脚 线架 操作面板 电源开关 脚踏开关 2 2 1 2 5 3 2 6 2 4 2 7 机架 ...
Страница 9: ...高速电子套结机 5 7 电线的连接 脚踏板 操作面板 8 眼睛防护罩的安装 为防止断针飞起弄伤眼睛 请一定安装起来 将附件箱中眼睛防护罩装在机头 如图所示左侧 ...
Страница 25: ...高速电子套结机 21 图1 ...
Страница 67: ...高速电子套结机 Ⅵ 台板图纸 63 Ⅱ ...
Страница 96: ...COMPUTER CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE 25 图1 ...
Страница 97: ...6 ...
Страница 146: ...COMPUTER CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE 75 Ⅵ DRAWING OF THE TABLE Ⅱ ...