3
© Copyright 2017 Zoeller
®
Co. All rights reserved.
On some installations it may be desirable
to install an independent hanger for the
level control switches to avoid possible
hang ups on the pumps, piping, valves,
etc. Float hangers are available from
Zoeller Company on Catalog Sheet
FM0526 or can be fabricated from stan-
dard pipe and fittings.
SUGGESTED METHODS OF FLOAT INSTALLATION
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
TYPICAL FLOAT HANGER ON STEEL COVER PITS
ACCESS COVER
STANDARD PIPE
FLANGE
PVC OR LIGHT WEIGHT
STAINLESS STEEL PIPE
PEA GRAVEL
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
10-1457 FLOAT TREE
WITH 3 FLOATS SHOWN
SK1217
SK1218
RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
All installations must comply with all applicable electrical and plumbing codes, including, but not limited to, National Electrical Code, local, regional, and/or state plumbing
codes, etc. Not intended for use in hazardous locations.
(1) Electrical wiring and protection must be in accordance with National
Electrical Code and any other applicable state and local electrical
requirements.
(2) Install proper Zoeller unicheck (combination union and check valve),
preferably just above the basin to allow easy removal of the pump for
cleaning or repair. On sewage, effluent or dewatering, if high head or
below cover installation is required use 30-0164 on 1-1/2" pipe, 30-0152
on 2" pipe and 30-0160 on 3" pipe. See (4) below.
(3) All installations require a basin cover to prevent debris from falling into
the basin and to prevent accidental injury.
(4) When a Unicheck is installed, drill a
3
/
16
" (5 mm) dia. hole in the
discharge pipe even with the top of the pump.
NOTE: THE HOLE
MUST ALSO BE BELOW THE BASIN COVER AND CLEANED
PERIODICALLY.
(High Head unit see #3 under “Caution” on front page).
Water stream will be visible from this hole during pump run periods.
(5) Securely tape or clamp power cord to discharge pipe, clear of the float
mechanism(s).
(6) Use full-size discharge pipe.
(7) Basin must be in accordance with applicable codes and
specifications.
(8) Pump must be level and float mechanism(s) clear of sides of basin
before starting pump.
(9) Basin must be clean and free of debris after installation.
(10) Gate Valve or Ball Valve to be supplied by installer and installed
according to any and all codes.
(11) Locate float switches as shown in sketches. The best place for the “off”
point is above the motor housing and positioned 180° from the inlet.
Never put “off” point below discharge on pump (Sewage &
Effluent only).
NOTE: FOR AUTOMATIC PUMPS, USE DEWATERING
INSTALLATION SKETCH.
(12) Gas tight seals required to contain gases and odors.
(13) Vent gases and odors to the atmosphere through vent pipe (Sewage &
Dewatering only).
(14) Install Zoeller Pump Stand (10-2421) under pump to provide a
settling basin. (Effluent & Dewatering only.)
For Effluent Only:
(15) Wire pump to power through a Zoeller watertight junction box or
watertight splice.
NOTE: Watertight enclosure is a must in damp
areas. See No. 8 on front page of FM0732.
(16) Refer to SSPMA Effluent Sizing Manual for determining “on” - “off”
switches.
(17) Septic tank risers must be used for easy pump and filter access.
NOTE:
Double seal pumps offer extra protection from damage caused by
seal failure.
TYPICAL SEWAGE INSTALLATION
SK290
4” (100 mm)
OF GRAVEL
Always refer to
FM0551 and/or
SSPMA recom-
mended sewage
pump installation
and maintenance.
TYPICAL EFFLUENT INSTALLATION
SK291
WW1
EFFLUENT
FILTER
See FM0531,
FM0732 & FM1420
for alarms, controls
& junction boxes
TYPICAL DEWATERING INSTALLATION
SK292
TURN
ON
TURN
OFF
1
2
3
7
9
14
8
6
4
5
10
12
13
4” (10 cm) OF GRAVEL
MINIMUM
(457 mm X 610 mm)
18"x24" BASIN
LARGER DEPTHS
MAY BE
REQUIRED.
See FM0531, FM0732 & FM1420 for alarms,
controls & junction boxes