5
2.3 Hydraulic connections
VE: water intake valve
VB: by-pass valve
VS: water output valve
* minimum distance
Z200
M3
M4
M5
Test pressure
bar
6
Service pressure
bar
1.5
Load loss
mCE
1
1.5
1.5
Water flow
optimum
minimum
m³/h
6
8
8
Water flow
maximum*
m³/h
10
* rate not to be exceeded
Follow the hydraulic connection direction
(see § «Sizes» in the appendix).
• The connection will use Ø50 piping, or Ø40 using the supplied adapter (see §1.2), use the half-union fittings to connect
to the pool filtering circuit, after the filter and before water treatment.
• Installing a by-pass is mandatory and facilitates operations on the appliance.
• Adjust the water flow using valve VB, and leave valves VE and VS open.
• Make sure the hydraulic fittings are correctly tightened and that there are no leaks.
Condensate drainage: warning, your appliance can release several litres of water per day; it is highly recommended
to connect the drainage to the drains.
Connect an interior Ø15 pipe (not supplied) to the corrugated angle to be fitted under the appliance base
(supplied, see §1.2).
2.4 Electric connections
2.4.1 Voltage and protection
• The appliance is designed for connection to mains electricity using a neutral TT and TNS wiring,
• Electric protection: using a circuit breaker (D curve) (see § 2.4.3 for ratings), with a 30 mA ground fault circuit breaker at
the head of the line (circuit breaker or switch).
Acceptable voltage variation: -10%, +7% (while running).
2.4.2 Connections
• Check the strength of the power supply cable on the connection terminal block
• Loose terminals can cause the terminal block to heat and lead to the warranty being voided.
• It is imperative to connect the appliance to an earth rod.
• Risk of electric shocks inside the appliance.
• Only a qualified and experienced technician is authorised to wire inside the appliance.
• If the power supply cable is damaged it should be replaced by a qualified technician.
2.4.3 Cable size
• Power supply cable and plug are factory fitted for models M3 and M4 for Australian customers. For other models and
other regions the table provided below indicates the requirements for cabling: for a maximum length of 20 metres
(calculation on the basis of: NFC 15-100), must be checked and suitable for the installation conditions.
Z200
Voltage
I Maximum absorbed
Minimum cable section
Electric protection
A
mm²
A
M3
230V-50Hz
8.7
3x1.5
3G1.5
16
M4
230V-50Hz
12.4
3x1.5
3G1.5
20
M5
230V-50Hz
15.5
3x2.5
3G2.5
20
phase (L) + neutral (N) + earth (PE)