Swing Gate Opener
User Manual
P a g e
| 14
Copyright©2022 ZKTECO CO., LTD. All rights reserved.
Expansion screw Hexagon screw
Nut
Nut
Hexagon screw
Nylon gasket
1.
The connecting bracket and the wall bracket can be connected according to different
conditions, please refer to the figure 5.
2.
Users should prepare power cables for the control box and the main machines by themselves
due to the different installation environment. The control box power supply cable should have
more than 3 cores, whereas the motor cable should have 2. If users need to install external
accessories such as an electric lock, infrared sensor, alarm lamp, or external button switch.
Increase the embedded cables accordingly do make sure the sectional diameter of the electric
lock cable is over 1.5mm2, and the sectional diameter of the other cables is over 0.5mm2. Users
should determine the cable length based on their installation situations.
Note:
The outlet on the PVC pipe should be downward to avoid the rainwater flowing into the pipe
along the cable.
3.
Please unlock the two main machines before proceeding with the installation. Method of
unlocking: Remove the cover, insert the manual release bar, and rotate the bar until it is
released, as indicated in Figure 6. Then turn the telescopic arm to stretch it easily.
Figure 4
Figure 5