Zippkits J.A.E. RACING Envy GAS Outrigger Скачать руководство пользователя страница 3

 

 

3

 

Tools and supplies needed to build 

 

 

Sanding blocks with 80 and 150 grit paper 

 

220, 400 and 600 grit paper 

 

Drill with bits 

 

Square 

 

Flat file 

 

FLAT Workbench 

 

Building Jig (see below) 

 

1/2  ounce Medium CA glue and accelerator 

 

Good quality 30 minute epoxy 

 

Epoxy finishing resin 

 

Spring clamps, paper clamps, c clamps, etc. 

 

Weights or bricks 

 

Razor blade or X-Acto knife 

 

Masking tape 

 

Waxed paper 

 

Wood filler 

 

Primer 

 

Paint 

 
 
 
 
 
 
 
 
 

Содержание J.A.E. RACING Envy GAS Outrigger

Страница 1: ...1 Z I P P K I T S Envy GAS Outrigger A Zippkits R C Boat Building Instructions 2015 JMP Hobby Group LLC www zippkits com Toll Free 866 922 ZIPP...

Страница 2: ...The kit is not hard to assemble as all of the hard stuff has been done for you That is no excuse to do a poor job with assembly The better you build this boat the better it will run Often the differe...

Страница 3: ...per Drill with bits Square Flat file FLAT Workbench Building Jig see below 1 2 ounce Medium CA glue and accelerator Good quality 30 minute epoxy Epoxy finishing resin Spring clamps paper clamps c clam...

Страница 4: ...rod 4 40 Size Zipp3463 4 40 ball link Zipp 3457 4 40 solder clevis Zipp 3455 Throttle pushrod 2 56 size Zipp 3462 2 56 nylon clevis Zipp 3459 3 pushrod seals Zipp 3422 Small or Medium Fuel Cell Zipp 3...

Страница 5: ...5 Let s identify some of the parts so that we can easily find them when needed 1 16 Ply parts 1 8 Ply parts...

Страница 6: ...6 Foam parts Miscellaneous parts...

Страница 7: ...to Every critical component on this hull depends on a straight square tub Do whatever it takes to get it done correctly The assembly order and the direction that parts must face is important If not a...

Страница 8: ...parts and you can see writing check again Notice the little ledge at the rear of the inner sides This is for the radio box lid frame Glue the inner sides to the outers making sure that you have a RIGH...

Страница 9: ...all holes in the bulkheads line up as well Laminate the transoms T and T together Do not laminate TD at this time Once all bulkheads are laminated check the fit of the bulkheads in the right tub side...

Страница 10: ...ure that the bottom extends to the front bulkhead It should cover the full 1 4 inch bulkhead and be flush with the front If necessary adjust or rack the tub frame so that it aligns perfectly with the...

Страница 11: ...ose for sheeting and provides a solid base for the tub nose block There should be a slight overhang on all sides so that the sub nose can be sanded to shape Glue in the lid frame support This goes on...

Страница 12: ...Glue in the transom doubler TD This goes in front of the transom The cooling holes should line up Glue in the two transom braces in place on each side of the transom doubler Clamp all until cured You...

Страница 13: ...ide down tub back in the jig Sand the forward tub bottom so that the FWD bottom sheet will sit flat This will include sanding a bevel on the aft bottom to match the angle of the sides Glue the forward...

Страница 14: ...s encouraged to shear off cleanly for much less drag Drill two 1 8 inch holes through the tub sides into the transom Make these about inch deep Cut 4 pieces of bamboo skewer about an inch long Put a d...

Страница 15: ...tube or drill bit to make sure that the engine is aligned with the holes in the rear bulkhead and floor Put the inch tube or bit in the collet and snug it up by hand If you want to be precise about th...

Страница 16: ...t the back of the boat Cut the brass tube here The 5 16 inch brass tubing needs to be annealed This will make it easy to bend by hand without kinks Only anneal the brass tube from the mark you made re...

Страница 17: ...m and through bulkhead 3 Put the end that you didn t anneal towards the engine The tube should start inch behind the engine and continue about 6 inches behind the transom Glue the shaft tube in place...

Страница 18: ...out the transom Put a drop of epoxy around each tube where it goes through each bulkhead Do both sides of the bulkheads for a leak free installation Ski Assemble the 4 parts of the ski using epoxy or...

Страница 19: ...excess run forward Sand a sharp bevel on the rear of the ski bottom sheet so that it matches the ski sides Sand the outside of the ski all around Sand the front of the ski bottom so that it tapers to...

Страница 20: ...s Strut Make a pencil line in the center of the transom and mount the strut bracket flush with the top of the transom Slide the strut onto the shaft tube and bolt in place Bolt the strut in the tub to...

Страница 21: ...t skip this step We need to make sure that both sponsons are exactly correct with reference to the tub If they are off the boat will never handle properly The process is simple Take your time measure...

Страница 22: ...lly remove the aluminum boom tubes before the epoxy fully cures Wipe off any epoxy on the tubes before it cures Rudder Servo You must use a digital servo with at least 250 oz in of torque Assemble the...

Страница 23: ...and 4 servo screws Notice that the screws only need to be snug to hold the servo securely in place This mount puts the servo arm in the correct position for a straight pushrod run to the rudder We wil...

Страница 24: ...der us straight Use epoxy to glue the mount in place again making sure that the rudder is straight Don t get any glue on the servo or wire Allow to cure Throttle servo The throttle servo is mounted to...

Страница 25: ...tion The servo should not touch the tub floor Use either a Z bend or an EZ connector at the servo Glue the servo mounts to the tub floor Don t get any glue on the servo Allow to cure Fuel Bag Mount Th...

Страница 26: ...mount to the tub correct Remove everything in preparation for sealing Sealing Using epoxy finishing resin or West Systems epoxy seal the inside of the tub Seal every part of the wood In the boom tube...

Страница 27: ...lush with the outer sides If you find anything a single edge razor can be used to scrape it away Once you are happy with the fit of the lid frame glue it in place sealed side down Tape and weight this...

Страница 28: ...check to make sure the deck is in the correct position and in contact all around Allow to cure Sand the top deck flush all around Sand the front of the tub flat for the nose block Glue the pine nose b...

Страница 29: ...sponson inside and outside plates by lightly sanding the edges Put the RH sponson outside 3 big holes on the bench Mix up some 30 minute epoxy and coat the inside of the sponson plates and both sides...

Страница 30: ...the sponson sides are cured let s do the sheeting This is where the strange order comes in The sheeting is done in this order because it has to overlap in a specific way Follow along and you won t ha...

Страница 31: ...ace with overhangs Once these have cured sand the bottom and sides of S 2 and S 1 flush 2 glued in place Glue S 3 in place S 3 is 1 16 ply Glue S 4 and leave an overhang in the rear S 4 is 1 8 ply It...

Страница 32: ...t of S 4 flush with the forward bottom This is exactly like the forward tub bottom Do not round any corners Glue S 5 in place Match the rear to just cover the bevel you sanded in S 4 Leave the rear of...

Страница 33: ...an now epoxy the aluminum sponson plugs in place Glue the plugs in place so that the right sponson has the wood dowels The sponsons should be a mirror image of each other Check the length of the alumi...

Страница 34: ...5 32 hole through the aluminum boom tube and the sponson plug Put the supplied 6 32 screw and locknut in place Do this for all 4 corners Remove the right sponson but leave the left one attached to the...

Страница 35: ...and until it is gone Sharpen the outside RH of the turn fin Make a bevel at least 3 8 inch wide along the front and bottom of the fin Mark the center of the turn fin dowels Drill 3 16 holes on your ma...

Страница 36: ...ng easier Also seal the radio box top When cured sand with 150 and recoat with epoxy This coat will use far less resin than the first When this cures wet sand the bottom of everything with 220 Ski Tes...

Страница 37: ...be at the very bottom of the ski for the proper propeller depth Make the ski parallel with the tub bottom 0 degree angle Slide your drive dog onto your flex shaft then your prop Leave about half of th...

Страница 38: ...t the sponsons on with the 6 32x7 8 screws and locknuts Measure the sponsons and adjust until the right sponson has toe in and the left is straight The sponsons should be centered equal distance from...

Страница 39: ...shut off and will be embarrassing and dangerous Mount your switch with a waterproof switch cover Make sure that your tuned pipe is mounted to the tub Make sure your prop is sharpened and balanced Grea...

Страница 40: ...intlwaters com Excellent forum for information on R C boats lots of general JAE discussion Klass Kote Epoxy Paint www klasskote com Phone 612 243 1234 Source for the best epoxy paints Servo City www...

Страница 41: ...ose and adjusted back the boat rides wet If the boat rides up in the turn fin especially with left rudder the fin is angled too far forward Tips Do not change the ride attitude or height Leave the AOA...

Страница 42: ...ilding setup and running We encourage you to experiment with different props and pipe settings Props make all the difference in the world as far as speed and handling go We can be reached by email at...

Отзывы: