9
Glue 5A to the front of 5B.
Glue the center section 1/16 (radio box) sides in place.
They fit into slots in the floor, as well as tabs in the
bulkheads.
Make sure that all tabs are fully seated and that the
bottom meets the floor.
Try not to get any glue fillets on the outside of these
sides, as it will interfere with the installation of F6-F9.
One way to do this is with the glue fillet method,
using medium CA.
Install both 1/16 ply sides, snapping all tabs in place and
checking that everything is fully seated.
There is a lot going on, and there are tabs and slots
everywhere.
Once they are in place and fitted properly, run a bead of
CA inside the bottom.
Lift the side free of a bulkhead and put some glue in the
gap and press it together.
Do this for all bulkheads.
Only use glue on the inside, otherwise the next step will
be difficult.
Glue in F6, F7, F8 and F9.
They go against the center section on the outside, and
provide a gluing surface for the top deck sheeting.
Numbers go forward as shown.
You may have to sand or bevel these to fit over any glue
fillets.
Do it, as these must be fitted correctly or the top won't fit.
They should all sit flush with the top of all bulkheads.
They provide support for the deck sheeting.
Содержание G30
Страница 1: ...1 G30 Outboard Tunnel Hull For 21 Nitro or 4S electric Length 30 5 inches Beam 11 5 inches...
Страница 24: ...24...
Страница 25: ...25...