
Page 18 of 36
802253UK - Boiling chilled residential installation instructions - Aug 2015 - V2.02
Installation instructions
Installing the All-in-One 'Mains' tap
1.15 All-in-One ‘Mains’ connections
• Connect the red, blue and clear silicone tubes &
USB cable to the Command-Centre
TM
as shown.
• Working from inside the cupboard, attach
the braided hoses to the tube extensions
(ensure the seals on the end of the hoses
are lubricated). Check the correct position for
hot and ambient connections by matching the
colours on the braided hoses with the coloured
markings on the copper extension tubes. (See
adjacent diagram).
• The braided hose with the blue markings must
be connected to the ambient mains supply.
• The braided hose with the red markings must
be connected to the hot mains supply.
• Do not over tighten the braided hoses.
• Ensure that all tubes and hoses are firmly
secured.
Blue silicone tube -
CHILLED OUT on
Command-Centre
TM
Clear silicone
tube - VENT on
Command-Centre
TM
Red silicone tube -
BOILING OUT on
Command-Centre
TM
Braided hose with blue
marking - ambient
domestic supply.
Braided hose
with red marking
- hot domestic
supply.
Note
All silicon /
plastic tubes must be
cut to size. They must
have a constant fall
back to the
Command-Centre
TM
.
1.14 Base block spider markings and silicone tube positions
(viewed from
underneath).
Blue marking
Red marking
USB cable
Blue silicone tube
Red silicone tube
Clear silicone tube
(see page 29 for Command-Centre
TM
connections)
Braided hose with
blue marking
Braided hose with
red marking
RED
CLEAR
BLUE
BRAIDED
POWER
CABLE
USB
MAINS
IN
MIXER
OUT
MIXER
IN
BOILING
OUT
BYPASS
IN
VENT BYPASS
OUT CHILLED
OUT