802253UK - Boiling chilled residential installation instructions - Aug 2015 - V2.02
Page 17 of 36
All-in-One tap
'Mains' installation
O-ring
Base block
spider
Base block nut
USB cable
Note
Make sure the tap location will allow the tap
spout to drain into the sink.
1.13
1.12
Cut a
Ø
50mm hole in the work / sink top.
Ø
50mm
•
Fit the o-ring to the underside of the AIO tap then
pass tubes, hoses and cable through the Ø50mm
hole
.
•
Feed each of the tubes and USB cable evenly in
between the legs of the base block spider.
•
Fit the base block spider to the underside of the
All-in-One tap.
•
Clamp in position using the base block nut.
Note
All silicon tubes must be cut to size. They must have
a constant fall back to the Command-Centre
TM
.
(see page 29 for Command-Centre
TM
connections).
Clearance
envelope
535mm
min. 300mm
335mm