background image

INSTALLATION AND OPERATING INSTRUCTIONS:

 

Tool changer, pneumatic, WWR1000 series

Zimmer GmbH 

 Im Salmenkopf 5 

 77866 Rheinau, Germany 

 Phone: +49 7844 9138-0 

●  

Fax: +49 7844 9138-80 

 www.zimmer-group.de

11

DDOC00291 / 0

EN / 2018-09-1

1

8.2.2 Installation of the ALSR1-1200 on the loose part

IMAGE 1

 

Put the claw 

cn

 together with the loose 

part 

bp

.

 

Æ

The clamping plate 

co

 is inserted 

into the provided groove.

 

Æ

Slide the claw 

cn

 with the clamping 

plate 

bp

 onto the loose part 

bp

.

IMAGE 2

 

Put the claw 

cn

, the loose part 

bp

 and 

the clamping plate 

co

 together using 

the supplied cylinder screws 

cp

cq

 

and 

cr

.

 

Æ

The correct tightening torques must 

be observed.

 

Æ

http://www.schrauben-normen.de/

anziehmomente.html

IMAGE 3

 

Here, the installed loose part 

bp

 can 

be viewed with claw 

cn

 from below.

IMAGE 4

 

Place the claw 

cn

 with fitted loose part 

bp

 and bolt 

cs

 in the holder 16.

IMAGE 5

 

The tilt of the storage position can be 

changed by twisting the adjustment 

bolt 

cr

 

 The position is fixed by 

tightening the locknut.

cn

cr

co

cp

cq

cn

cs

br

cr

bp

bp

Image 1

Image 2

Image 3

Image 4

Image 5

Содержание WWR1000 Series

Страница 1: ...Handling Technology WWR1000 series Pneumatic tool changers THE KNOW HOW FACTORY INSTALLATION AND OPERATING INSTRUCTIONS www zimmer group de...

Страница 2: ...ational readiness 7 7 Pneumatic connection 7 7 1 Control category 1 7 7 2 Control category 3 locked 8 7 3 Control category 3 unlocked 8 8 Installation of accessories 9 8 1 Installation of the inductiv...

Страница 3: ...which the element may cause a hazard the element is not properly fitted used or maintained the element is not used for its intended purpose local regulations legislation ordinances guidelines such as...

Страница 4: ...forces and torques that the element has to absorb must not exceed the recommended parameters WARNING Danger of injury if the element is not operated as intended The element must never be operated with...

Страница 5: ...fit through the locking bolts 4 in the locking sleeve 8 The required stroke is generated by a double acting pneumatic rotor cylinder 5 An integrated spring 6 acts as an energy storage and preserves t...

Страница 6: ...e before all work Secure the machine against being switched on unintentionally Check the machine for any residual energy 6 1 Installation of the element The element may only be mounted on the surface...

Страница 7: ...o the following characteristics Look and listen for leaks in the pneumatic connections Check all mounting screws for their prescribed tightening torque Look and listen for leaks in the pressurized ele...

Страница 8: ...nsors high Additional storage space control or tool encoding by means of optional transponders Control category 4 possible PL e each error is detected before the safe locking or unlocking safety funct...

Страница 9: ...sk of injury in case of unexpected movement of the machine or system into which the element has been installed Switch off the energy supply to the machine before all work Secure the machine against be...

Страница 10: ...must be programmed to the storage positions A storage station includes a holder br a spacer plate bs only required for the WWR1160 model and a claw cn including all mounting hardware No spacer plate...

Страница 11: ...plate bp onto the loose part bp IMAGE 2 Put the claw cn the loose part bp and the clamping plate co together using the supplied cylinder screws cp cq and cr The correct tightening torques must be obse...

Страница 12: ...talled at two positions cu in the fixed part 9 The bolt dq is the dampening element of the sensor 9 Emergency release If the loose part bp cannot be disengaged on an occasion e g crash it can be manua...

Страница 13: ...ranteed for up to 5 million cycles The maintenance interval may shorten under the following circumstances Drive with non filtered compressed air 10 m dry or lubricated Unclean environment Use not in a...

Страница 14: ...1 5 4 No 1 5 8 No 1 6 4 No 1 7 1 No 1 7 4 We also declare that the specific technical documents were produced in accordance with Annex VII Part B of this Directive We undertake to provide the market s...

Страница 15: ...OPERATING INSTRUCTIONS Tool changer pneumatic WWR1000 series Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany Phone 49 7844 9138 0 Fax 49 7844 9138 80 www zimmer group de 15 DDOC00291 0 EN 2018 09 1...

Страница 16: ...ION AND OPERATING INSTRUCTIONS Tool changer pneumatic WWR1000 series Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany Phone 49 7844 9138 0 Fax 49 7844 9138 80 www zimmer group de 16 DDOC00291 0 EN 20...

Отзывы: