
Section 4.0
MAN 06–0017H
ZIEHM QUANTUM
User’s Manual
Page 37 of 220
4.0
UNPACKING INSTALLATION
4.1
INSTALLATION PROCEDURE
4.1.1
AUDIENCE
This Installation section of the manual is written to Service Engineers. It does not contain any
procedures that can be performed by the System Users.
DO NOT
allow System Users to perform
any of the service tasks described in this installation section of this manual, or any tasks that are
not described in the User Manual.
In order to be qualified to perform the Installation procedures described in this section of the
manual, Service Engineers must attend formal training provided by
Ziehm Imaging, Inc.
(hereafter referred to as the manufacturer).
4.1.2
DETAILED INFORMATION
More Detailed Instructions of how to unpack and assemble the system are supplied with the
system Service Manual.
4.1.3
ROOM TEMPERATURE
In case of major differences in the system temperature, all parts of the System must have reached
room temperature before the system is put into service in order to avoid damage to the system as
a result of condensation.
WARNING:
Do not operate the system until the equipment has reached a safe operating
temperature of +15°C to +35°C with no condensation present. Otherwise severe
equipment damage may result.
WARNING:
You must be familiar with the contents of this user manual in order to be able to
operate the system as intended. Study this user manual thoroughly before
operating the system.
It is important to observe all directions, safety instructions and warnings!
WARNING:
Only authorized personnel are allowed to unpack and assemble the system.
During assembly, the system may be handled only by trained personnel who have
studied the contents of
Ch. 4, Unpacking and System Power On
and
Ch. 5,
Mechanical Handling
.
4.1.4
SHIPPING CONTAINER UNPACKING
The system is shipped on a single pallet and contains the Mobile Stand (C-Arm), Monitor
assembly, and 18” LCD Monitors (un-mounted).
Carefully inspect the equipment for damage. If you find any damage, immediately report it to the
shipping carrier in the form of a damage claim.
4.1.5
UNPACKING
Unpacking of the x-ray system is to be carried out by authorized, qualified personnel.
Содержание QUANTUM
Страница 1: ...ZIEHM QUANTUM USER S MANUAL...
Страница 2: ...Table of Contents MAN 06 0017H ZIEHM QUANTUM User s Manual Page 2 of 220...
Страница 10: ...About this Manual MAN 06 0017H ZIEHM QUANTUM User s Manual Page 10 of 220...
Страница 12: ...About this Manual MAN 06 0017H ZIEHM QUANTUM User s Manual Page 12 of 220...
Страница 51: ...Section 5 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 51 of 220 5 1 2 TRANSPORT POSITION FOR ZIEHM QUANTUM...
Страница 71: ...Section 6 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 71 of 220...
Страница 96: ...Section 7 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 96 of 220...
Страница 132: ...Section 9 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 132 of 220...
Страница 165: ...Section 10 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 165 of 220 Fig 10 13 Configuration Screen...
Страница 180: ...Section 11 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 180 of 220...
Страница 185: ...Section 12 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 185 of 220 Fig 12 1 Focal Spot Reference...
Страница 196: ...Section 12 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 196 of 220...
Страница 202: ...Section 14 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 202 of 220...
Страница 204: ...Section 15 0 MAN 06 0017H ZIEHM QUANTUM User s Manual Page 204 of 220 Fig 15 2 Generator Laser Alignment Labels...