
Construction drawing:
A-21-121-0006_02 index A03 dated 04.04.2017
A-21-121-0006_02 index A04 dated 19.12.2019
Permissible shaft ma-
terials:
Steel DIN EN 10083-3:2007-01
–
QT (1.7225+QT)
Steel DIN EN 10083-3:2007-01
–
QT (1.7227+QT)
Steel DIN EN 10083-3:2007-01
–
QT (1.7228+QT)
Permissible traction
sheave hub materials:
Steel DIN EN 10083-2:2006-10
–
C45+N (1.0503+N)
Cast iron DIN EN 1561:2012-01
–
EN-GJL-300 (GG-30)
Permissible feather
key
traction sheave materi-
als:
Steel DIN EN 10083-3:2007-01
–
QT (1.7225+QT)
Permissible brake
rotor
materials:
DIN EN 1706:2013-12 AC-AlZn10Si8Mg (AC71100)
tensile strength R
eN
= 210 N/mm
2
Load data:
Maximum permissible static operating shaft load
F
R
44.2 kN
Distance from bearing A to centre traction sheave
to
122 mm
Rated torque
T
r
850 Nm
Maximum torque
T
max
1600 Nm
Magnetic force
F
Mag
3130 N
Nominal brake torque
T
Br
2400 Nm
Maximum brake torque
2 x T
Br
4800 Nm
Rated speed
n
r
400 rpm
Translation of the original operating instructions
ZAtop
–
model series SM210.60B/SM210.70B
Enclosure
A-TBA17_01-GB 2023/46 Index 008Part.-No. 01013389-GB (EU-BD 1014/1)
89/96