DECLARATION OF HANDOVER
Content
Page
Declaration of Conformity
Declaration of Handover
Content
1. Introduction ........................................................................................................ 38
2. Prevention of Accidents and Damage ................................................................ 38
3. Integration of the Dosing Device into the Processing Chain .............................. 39
4. Assembly ........................................................................................................... 40
a)
Mounting of the Nozzle Holders
.................................................................. 40
b)
Mounting of the Tightening Straps
............................................................. 41
5. Electrical Connection of the Unit ........................................................................ 42
6. Connection of the Acid Vessel ........................................................................... 42
7. Dosing of the Acid .............................................................................................. 43
a)
Determination of the Moisture Content of the Grains
................................ 43
b)
Quantity of Propionic Acid needed depending on the Storage Time
....... 43
c)
Conveying Capacity of the Outlet Auger
.................................................... 43
d)
Determination of the Acid Quantity
............................................................. 43
e)
Selection of the Nozzle Size
......................................................................... 44
f)
Example for the correct Preparation
........................................................... 44
8. Commissioning of the Unit ................................................................................. 46
9. Setting of the Dosing Quantity ........................................................................... 48
10. Switching OFF the Device .................................................................................. 49
11. Maintenance and Care ....................................................................................... 49
12. Possible Faults and their Remedy...................................................................... 50
13. Technical Data ................................................................................................... 50
14. Tables ................................................................................................................ 51
Table 1 .................................................................................................................. 51
Table 2 .................................................................................................................. 51
Table 3 (according to BASF) ................................................................................. 52
15. Electrical Schematic ........................................................................................... 53
a)
Electrical Schematic PKT 452/454
............................................................... 53
b)
Graphic Presentation of the Control Box
................................................... 54
Spare Parts List for
PKT 452/454
.......................................................................... 55
Содержание PKT 452
Страница 2: ......
Страница 4: ......
Страница 13: ...Abb 4 Kontaktnehmer Kontaktnehmer Mitte Schwimmeroberkante Kontaktgeber ...
Страница 22: ...22 b Bildliche Darstellung des Schaltkastens Abb 9 K 3 K 1 K 2 ...
Страница 25: ...25 Bild 1 7 8 50 5 10 6 4 4 3 11 13 Bild 2 9 12 7 8 27 ...
Страница 26: ...26 Bild 3 Bild 4 15 13 11 4 9 10 14 4 4 7 6 9 ...
Страница 31: ......
Страница 34: ...34 ...
Страница 36: ...36 ...
Страница 45: ...45 Diagram 13 Contact Maker Contact Maker Center Cwenter Floater Upper Edge Contact Maker ...
Страница 54: ...54 b Graphic Presentation of the Control Box Diagram 18 K 3 K 1 K 2 ...
Страница 57: ...57 Image 1 7 8 50 5 10 6 4 4 3 11 13 Image 2 9 12 7 8 27 ...
Страница 58: ...58 Image 3 Image 4 15 13 11 4 9 10 14 4 4 7 6 9 ...
Страница 63: ...63 ...