Installation and Operating Instructions V02
23
Procedure:
1.
Switch off the AC circuit breaker and secure it against reconnection.
2.
Loosen the screws of the cover using a screwdriver (T25) and remove the cover.
3.
Strip the AC cable’s outer sheath 70 mm. Shorten L and N by 10 mm each. Strip the
insulation of L, N, and PE conductor by 12 mm.
4.
Route the AC cable into the inverter through the M20 cable gland.
5.
If necessary, slightly loosen the swivel nut of the cable gland.
6.
Insert bared conductor into the cord end terminal and crimp the contact.
loosen the screws of the cover
During loosening the screws of the cover, it is not necessary to take
off the screws and conical spring washers, which can remain on the
cover and will not fall off.
Содержание Zeverlution 1000S
Страница 1: ......