![Zeversolar Zeverlution 1000S Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/zeversolar/zeverlution-1000s/zeverlution-1000s_installation-and-operating-insctructions_932363017.webp)
16
Installation and Operating Instructions
V02
4.3 Mounting the inverter with the wall bracket
Mounting procedures:
1.
Use the wall bracket as a drilling template and mark
the positions of the drill holes, then drill 2 holes (
Φ
10)
to a depth about 70mm. During operation, keep the
drill vertical to the wall, and hold the drill steady to
avoid tilted holes.
2.
After cleaning the dust and other objects from the holes, place 2 wall anchors into
the holes, then attach the wall bracket to the wall using the hexagon head screw
delivered with the inverter.
Risk of injury due to damaged cables
There may be power cables or other supply lines (e.g. gas or water)
routed in the wall.
• Ensure that no lines are laid in the wall which could be damaged when
drilling holes.
Risk of injury when lifting the inverter, or if it is dropped
The inverter weighs approximately 8 kg. There is risk of injury if the
inverter is lifted incorrectly or dropped while being transported or when
attaching it to or removing it from the wall bracket.
• Transport and lift the inverter carefully
Содержание Zeverlution 1000S
Страница 1: ......