Speed of the Zuidberg front PTO
222
Speed of tractor with engine revolutions of 2 100 rpm and
parameter of rear wheels (km/h)
220
Standard and economical independent revolutions of rear
PTO shaft
134
Starting the engine
89
Starting the engine
14
Steps performed daily before the start of work
187
Steps performed every 100 hours of work
187
Steps performed every 50 hours of work
187
Steps performed every 500 hours of work
187
Steps performed outside the interval of 500 hours of work
188
Stop position
155
Stopping the engine
121
Stopping the tractor - manual brake
121
Suspension front drive axle
110
Suspension front drive axle
195
Swing drawbar
126
Swinging draw-bar console module
127
Swinging draw-bar console with a fixed pin module
127
Switch air-condition (C)
46
Switch box
42
Switch box key in the position (0)
42
Switch box key in the position (I)
42
Switch box key in the position (II)
42
Switches located on the control panel
39
Symbols of tractor nodes
63
System of additional treatment of exhaust gases
81
System of treatment of exhaust gases - setting
72
T
Technical data of engines
215
Technical maintenance of the tractors after a general
overhaul of the main groups
196
Temporary deactivation of the trailer or semi-trailer air
brakes using the handbrake lever
118
Tensile force
219
The buttons for activation of PTO shafts
132
The description of the system of travel clutches
95
The differences in ways of controlling the travel clutch by
95
The gauges of the tractor rear wheels equipped with solid
discs
172
The level of vibrations on driver´s seat
20
The principles of appropriate use of tractors
95
The processed area - setting of the width of aggregation
71
The socket for connection of the electrical installation of the
trailer or semi-trailer
120
The way of controlling the travel clutch by
95
Three-gear torque multiplier
105
Three-point hitch
196
Tilting and protrusion of steering wheel
36
Toe-in of the wheels of the front driving axle
170
Tractor greasing scheme
194
Tractor maintenance
187
Tractor operation brakes
29
Tractor shutdown and recommended points for tractor
lifting
212
Tractors equipped with front end loader
21
Trailer brakes
29
Transport of implements
155
Transportation
125
Transportation of persons, operation
15
Travel speed calibration
68
Turning on the one pedal braking system
114
Two-hose brakes
119
Tyres and wheels
29
U
Unblocking the tractor brakes when the air pressure drops
115
Uncoupling of a single-axle trailer
128
Upper draw-bar
164
Upper working lights switching on
38
Urea (Aqueous Urea Solution AUS 32, DEF)
84
Urea (urea solution AUS 32)
193
Urea tank
52
Used operation liquids and filling - quantities
190
Using the rear control
158
V
Valve for filling tyre tubes with liquid
174
Vibration compensator (damper)
155
W
Warning signalization of air pressured drop
114
Warning signalization of hydrostatic steering failure
122
Washer nozzle
26
Water in the coarse filter of fuel
76
Wedging the front wheels
176
Weight of the front three-point hitch
174
Wheel track chang
169
Windscreen washer
37
Windscreen wiper
37
Windshield washer tank
26
Work with automatic disengagement of PTO shaft clutch
136
Work with PTO shaft
131
Working and transport position of the front three-point hitch
167
Working modes of PTO shafts
137
Z
Zeroing (reset) of the indicator of service inspection
intervals
62
Zetor service fillings
190
Zetor tractors used for work in the woods
23
INDEX
230
Содержание CRYSTAL HD 150
Страница 1: ...CRYSTAL HD 150 170 Tractor is Zetor Since 1946 OPERATOR S MANUAL 2 2018 150 170 2 2018 2 2018...
Страница 3: ...2...
Страница 25: ...NOTES 24...
Страница 31: ...NOTES 30...
Страница 81: ...NOTES 80...
Страница 125: ...NOTES 124...
Страница 131: ...NOTES 130...
Страница 169: ...NOTES 168...
Страница 183: ...Fuse panel B C18N004 ELECTRIC INSTALLATION 182...
Страница 227: ...226...
Страница 232: ...231...
Страница 234: ...www zetor com zetor zetor com Made in EU...