Figure 2: Leveling cases prior to joining
A. Measure and mark exact case outline
B. Mark floor level differences
C. Shim joints to equal highest points
INSTALLATION
Leveling
(Figure 2)
Cases must be installed perfectly level to allow efficient opera-
tion of the refrigeration coils and complete drainage of defrost
water. Since a level area is seldom available, the following steps
are recommended to insure a level installation.
1.
Measure off and mark on floor the exact dimensions of
the case lineup. (Check blueprints).
2.
Snap a chalk line at the locations for the front and back
positions of the base rails.
3.
Mark locations of all joints (front and back).
4.
Using a laser or transit, find the highest point along
both base rail position lines. Using the high point as a
reference, mark the difference directly on the floor to
each joint (front and back).
5.
If you plan on using optional hat channels to raise the
case height, place them under each pair of bases. The
3 and 4 door hat channels will be angled slightly
to support the front and rear bases. (Figures 3 & 5).
6.
Place the required number of shims under each base
or optional hat channel at each joint (front and back) to
equal the highest point.
The RVZC/P30 and 24, 2 through 5 door cases, have
segmented bases mounted at the ends and under the
center section of the case. The RVZC 1 door and BB
have full bases that run front to back and are located at
the ends and under the center sections of the case. The
RVZC WA & WB have segmented bases that run front to
back.
Tape all shims in place (Figure 2). Figure 4 shows the
correct orientation of shims under the base or channel.
7.
Place additional support shims under all other bases
or hat channels (Figures 5A, 5B & 5C)
.
8.
If you’ve purchased seismic restraints, specific instruc-
tions for attaching those restraints are included in your
document package. These instructions should be read
and followed before the line up is assembled.
9.
For alternate installation methods visit
www.zero-zone.com.
Case F
ron
t
Cas
e F
ro
nt
Содержание RVZC30
Страница 1: ......
Страница 2: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 2 0407...
Страница 5: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 5 0407 Figure 1 Case label information...
Страница 9: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 9 0407 Figure 5B All base locations...
Страница 10: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 10 0407 Figure 5C All base locations...
Страница 22: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 22 0407 Figure 21 Electric defrost 30 wiring...
Страница 23: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 23 0407 Figure 22 Electric defrost 24 wiring...
Страница 24: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 24 0407 Figure 23 Hot gas wiring...
Страница 25: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 25 0407 Figure 24 Single point wiring...
Страница 26: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 26 0407 Figure 25 Master satellite wiring...
Страница 29: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 29 0407 Figure 27 24 Electric Figure 26 30 Electric...
Страница 30: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 30 0407 Figure 28 Coil 30 Hot gas Figure 29 Coil 24 Hot gas...