The BB cases are shipped with wood planks that allow the use
of pipe rollers.  These wood planks should be removed after the
case is moved to its final location (Figure 6).

The RVC/P and BB cases have steel protective support plates
under the ends (not under insulated dividers).  These are de-
signed to protect the end from Johnson bar damage.

Use the following methods to move the cases.

Model

Fork lift

Johnson Furniture

Pipe

Safe (case)

from ends

bar

dolly

rollers

jacks

RVC/P 30 & 24

RVC WA & WB

*

RVC/P BB

* Fork lift from rear

Care should be taken when moving the cases.  The doors should
be secured so they cannot open while the case is moved.

Only experienced certified fork truck drivers should use fork
trucks to move the cases.  The case should only be lifted off
the floor as high as necessary for transport. The fork truck
should be driven slowly avoiding any abrupt motions or bumps.

The following fork lift dimensions must be maintained to avoid
damaging the case when it is lifted.

2-DOOR CASES:

Forks must extend from 26” to no more than 30” under the
case.

3-DOOR CASES:

Use 48” long Forks!
Forks must extend from 39” to no more than 43” under the
case.

4 & 5 DOOR CASES:

Use 48” long forks!
Forks must extend from 44” to 47” under the case.

Fork blades wider than 4 inches will not fit in the bases.

Spacer blocks are factory installed in the end bases of 4 and 5
door cases that use 4 1/2” bases (Figure 7). These blocks limit
the cases forward tilt while it is being lifted and must be used
when lifting 4 or 5 door cases with 4 1/2” bases.

For low shipping height applications, Zero Zone has optional
expandable bases.  As shipped, the base is 1¾” tall.  It is
attached with spacers that allow the base to slide away from
the bottom of the case creating a gap that allows the use of a
1½” thick fork truck blade (Figure 8).

Содержание RVZC30

Страница 1: ......

Страница 2: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 2 0407...

Страница 3: ...Refrigerant Piping 17 Figure 16 Penetration sealing 17 Figure 17A Refrigeration line sizing Frozen Foods 18 Figure 17B Refrigeration line sizing Ice Cream 19 Figure 18 45 elbow suction line 20 Tempera...

Страница 4: ...AT TIME OF DELIVERY AND ALL CLAIMS FOR DAMAGES MUST BE FILED WITH THE TRANSPORTATION COMPANY NOT WITH ZERO ZONE The carrier will supply necessary report and claim forms PACKAGING Each case in a line...

Страница 5: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 5 0407 Figure 1 Case label information...

Страница 6: ...tional hat channels to raise the case height place them under each pair of bases The 3 and 4 door hat channels will be angled slightly to support the front and rear bases Figures 3 5 6 Place the requi...

Страница 7: ...VZP30 and BB T TBB WA RVC24 7 0407 Figure 4 Shims under bases and case Figure 3 Typical hat channel locations Hat section Shim Base Shim Base Both corners of the base must be supported by shims to pre...

Страница 8: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 8 0407 Figure 5A All base locations 1 Door Case Wrap Around Case WA Back to Back Wrap Around Case WB...

Страница 9: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 9 0407 Figure 5B All base locations...

Страница 10: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 10 0407 Figure 5C All base locations...

Страница 11: ...floor as high as necessary for transport The fork truck should be driven slowly avoiding any abrupt motions or bumps The following fork lift dimensions must be maintained to avoid damaging the case w...

Страница 12: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 12 0407 Figure 8 Expandable base Figure 6 Removing wood planks Figure 7 Wood block inside base Spacers...

Страница 13: ...ases to be joined Figure 10 T Strips DO NOT APPLY EXCESS AMOUNTS OF BUTYL SEALANT THAT WOULD CAUSE IT TO SQUEEZE ONTO END FRAME METAL AREAS Caulk sealant used to join cases and complete the sealing re...

Страница 14: ...e and a drain trap to the tee Plug the open end of the tee using the clean out plug supplied with Figure 11 Required sealing for NSF approved installations the drain trap kit The drain line must be pi...

Страница 15: ...nt kick plate Installing Bumper Figure 14 The front kick plate and bumper attaches using 1 screws attached to brackets located on the front of the case The kick plate can be adjusted up and down to fi...

Страница 16: ...ers on a 2 door 3 spacers on a 3 door 1 To ease installation hook the bumper to the case and position the kick plate Then pull the bottom edge of the bumper forward hold the spacer in place and then i...

Страница 17: ...ired Figure 18 A piping chase in front of the fan shroud allows the refrigerant lines to be run through the right or left end frame Piping should not be placed near the electric defrost heaters The de...

Страница 18: ...8 2 820 5 280 5 8 2 250 4 220 5 8 1 920 3 600 5 8 7 710 12 800 7 8 5 290 8 780 7 8 4 230 7 030 7 8 3 610 6 000 7 8 12 810 20 300 7 8 8 790 14 000 7 8 7 040 11 200 7 8 6 010 9 530 7 8 20 310 41 000 1...

Страница 19: ...5 8 1 850 3 450 5 8 1 570 2 950 5 8 6 310 10 500 7 8 4 330 7 180 7 8 3 460 5 750 7 8 2 960 4 910 7 8 10 510 16 600 7 8 7 190 11 400 7 8 5 760 9 120 7 8 4 920 7 790 7 8 16 610 33 600 1 1 8 11 410 23 1...

Страница 20: ...ling or delayed cycling Figure 18 45 elbow suction line Temperature Control Adjustment When factory installed the temperature control is located to ward the right end of the case behind the black kick...

Страница 21: ...rs are de energized The defrost heaters are energized The compressor continues to run and pumps down the coil The compressor cycles off on its low pressure control If there is any residual liquid left...

Страница 22: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 22 0407 Figure 21 Electric defrost 30 wiring...

Страница 23: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 23 0407 Figure 22 Electric defrost 24 wiring...

Страница 24: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 24 0407 Figure 23 Hot gas wiring...

Страница 25: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 25 0407 Figure 24 Single point wiring...

Страница 26: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 26 0407 Figure 25 Master satellite wiring...

Страница 27: ...hermostat or probe attached to the dump line At ASHRAE test conditions termination ranges from 12 22 minutes If the cases are so equipped the defrost termination is 65 F Zero Zone provides a defrost t...

Страница 28: ...into the serpentine coil attached to the floor of the case and then into the evaporator Condensed liq uid leaves the evaporator through the side port distributor through a check valve into the liquid...

Страница 29: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 29 0407 Figure 27 24 Electric Figure 26 30 Electric...

Страница 30: ...RVZC30 and BB T TBB WA RVZP30 and BB T TBB WA RVC24 30 0407 Figure 28 Coil 30 Hot gas Figure 29 Coil 24 Hot gas...

Страница 31: ...ght switch off during the initial case temperature pull down to prevent the case lights from cycling off and on Always turn the lights off when replacing lamps Case Thermometer The cases are shipped w...

Страница 32: ...g Heaters are installed in the reverse order of how they were removed Evaporator Fans Air is circulated throughout the case with 115 volt low tempera ture fan motors These motors must be operating at...

Отзывы: