ZS MK2
24
Installation
www.zepro.com
5.4
Platform
1.
Check that all included components are clean,
clean where necessary.
2. Lubricate the lift arms’ metal bushings before
installation. Make sure that the small holes on
the inside of the bushing are filled with grease.
Use LE lubricant 4622.
3.
Lift the platform, suitably with the aid of a forklift
or lifting table, and align it with the lift arms.
4.
Install the platform on the arms, using the shafts
and bolts supplied. Tighten the screws.
Tightening torque: 80 Nm.
5.
Install one of the tilt cylinders on the platform.
Use the enclosed shaft and screw. Tighten the screw.
Tightening torque: 80 Nm.
NOTE!
Make sure the cylinder is installed with the grease
nipple facing up.
6.
Fit the support wheel on the shaft. Secure with
associated split pin.
NOTE
!
Lubricate the bushings before installation.
Picture 28. Take care to lubricate
the metal bushings initially
Picture 29. Install the platform on the arms
Picture 30. Install the tilt cylinder on the platform