39
SPIRAL CABLE
CONTROL UNIT
Function spiral cable control unit
SÄNKA
3
Lower
Push down button (3). The platform lowers
with the same speed. The constant flow
valve gives the same speed independent of
the load.
Operating, spiral cable control unit
1
2
3
UPP
VIPP
NER
Function, operation
NOTE!
Opening and closing function is
only allowed with fixed control
units.
TILT DOWN
2+3
Tilt up
Push tilt (2) and up (1) button in mentioned
order. The platform tilts up to horizontal
position. If the load is to heavy or placed
to far back on the platform at tilt up, the
overflow valve opens.
TILT UP
2+1
LIFT
1
Tilt down
Push tilt (2) and down button (3) in
mentioned order. The platform tilts
down against ground. Also here gives
the constant flow valve the same speed
independent of the load.
Lift
Push up button (1) The platform lifts with
the same speed. If the load is to heavy the
over flow valve opens.
Содержание Z 15
Страница 2: ......
Страница 8: ...8...
Страница 12: ...12 Possible notes and action taken Post installation check Pos Action taken Product approval...
Страница 48: ...48...
Страница 63: ...Notes...
Страница 64: ......
Страница 65: ......