Important Safety Warning 
  

PLEASE NOTE COOLING

 

SYSTEM HAS BEEN 

UNPLUGGED FROM BACK OF SWITCHBOARD 
(Leave for cooling contactor to insert into switchboard).

Do not try plug cooling system plug into 
switchboard until cooling system has been
commissioned by qualified air con contractor

PLEASE ENSURE THERE IS POWER TO 
THE ZELLABOX (SWITCHBOARD) BEFORE
COMMISSIONING THE COOLING SYSTEM

5.1

 

Condenser

Depending on the model and cooling capacity
the condenser maximum distance can vary between 20 
and 30 meters. The Zellabox is supplied with relevant 
cable length (3 core orange output to condenser & 4 core 
grey cable. The condenser draws its power from the 
Zellabox. The condenser size and weight can also vary 
depending on model and cooling capacity. 
The condenser will be positioned either on
the outer wall of the building or on the roof.

5.2

 

Commissioning

Once the Zellabox has been positioned in its
proposed location and connected to power 
the air conditioning contractor can commission 
the cooling system. 

Only once the air conditioning contactor has 
Connected wires to the condenser and plugged the 
grey and orange cable into the Zellabox, can the 
cooling be turned on. 

ENSURE THE COOLING SYSTEM PLUG IS
PLUGGED INTO THE CORRECT POWER 
SOCKET ON THE SWITCHBOARD

 

5.3 Wiring

The Zellabox is supplied with all the cables (orange and grey)
which is pre-coiled and ready to be run with the
copper piping during the commissioning process.
The pre-coiled condenser cables are located inside the Zellabox.

CONTRACTORS TO ENSURE BOTH ORANGE AND GREY 
CABLES ARE LOCKED BY TURNING THE YELLOW DISK ON THE 
SIDE OF THE CABLE PLUGS WITH A SCREW DRIVER.  

THE COOLING / AIR CONDITIONING CONTRACTOR MUST 
SUPPLY COPPER PIPING.

 

 

Zellabox 

Safety

 

Instructions 

  

  

  

 

 

5 Single & Dual cooling

 

system

 

commissioning

 

steps:

Wiring table (White Cable)

1- Live

Red / Brown

2 - Neutral

Blue / Black

3 - Signal

White

Green / yellow

Earth / Ground

Содержание Cubb

Страница 1: ...1 Zellabox Installation Manual...

Страница 2: ...mmissioning Reference for air conditioning contractor 5 1 Condenser 5 2 Commissioning 5 3 Wiring 5 4 Copper Piping 5 5 Start up Single Cooling 5 6 Start up Dual Cooling 6 Online Access PDView Access O...

Страница 3: ...ta storage equipment The facility in the form of a cabinet has a host of built in features which ensure that your server is secure accessible and fully portable The Micro Data Centre can accommodate y...

Страница 4: ...ote Caution needs to be taken when removing the side panels of the Micro Data Centre in particular when dealing with the 38U as they are heavy We recommend a 2 man lift when removing and re installing...

Страница 5: ...ED ELECTRICAL CONTRACTOR WITH THE NECESSARY TRAINING Zellabox Safety Instructions 3 1 Power Supply requirements Zellabox 3 2 Switchboard Operation Following the connection to mains power DEPENDING ON...

Страница 6: ...6 Zellabox Safety Instructions 3 Power connection 3 3 Power Supply diagram to PDU switchboard 12U Cubb only Cooling system RCD Mains power Cooling system UPS Power Non monitored sockets...

Страница 7: ...View FRONT VIEW ISOLATOR MAIN 3KVA UPS 6KVA UPS AVAILABLE POWER P ROT E CT I ON NO RCD DIVERTER SURGE 3 8 T O T AL C U T O U T 47 TOTAL CUT OUT 485 NOMINAL 19 INCH RACK CASE 10 1 8 1 8 1 8 1 8 RCD COO...

Страница 8: ...door is opened by the push button located inside the Zellabox See user manual for programming options Use card reader until you are ready for biometric access mode 4 3 L E D Key Pad Operation The defa...

Страница 9: ...issioning Once the Zellabox has been positioned in its proposed location and connected to power the air conditioning contractor can commission the cooling system Only once the air conditioning contact...

Страница 10: ...ble termination in condenser 4 core cable 1 Red Brown 2 Blue 3 White Green Earth 5 3 Wiring cont Electrical Hazard Ensure cooling system is in the OFF position on Zellabox base mounted switchboard and...

Страница 11: ...tem commissioning steps PLEASE NOTE WHEN PLUGGING THE CABLE CONNECTORS YOU SHOULD HEAR A CLICK TO CONFIRM CONTACT AFTER INSERTING THE PLUG ENSURE BOTH ORANGE AND GREY CABLES ARE LOCKED BY TURNING THE...

Страница 12: ...ape to keep dirt or water out Be sure to place a cap Rain Liquid pipe Inter unit wiring 2 Remove burrs with the cut surface facing downward so that the chips do not enter the pipe 3 Put the flare nut...

Страница 13: ...mode and FAN STRENGTH is on HIGH 9 Run both system together for 5 minutes ensure both systems are operating 10 Pull out both plugs without turning cooling system off from the permanent supply and plug...

Страница 14: ...ower case Z numeral 3 lower case L sign lower case B lower case O and lower case X c Accept the terms of use check box d Once connected to the PDU the following similar image should appear 4 Access th...

Страница 15: ...o OPTION 1 Press enter Use the following to access Login admin Password z3ll box Accept the terms of use check box OPTION 3 To access the Zellabox PDU through a network switch or something similar fol...

Страница 16: ...these steps Assign the desired IP address to the PDU by referring to OPTION 1 above Plug network cable switch directly into the PDU Access the PDU through local Display If you have any questions plea...

Страница 17: ...e next few slides Please note Accidental discharge will occur if this guide is not followed step by step For effective and safe installation follow the steps below Please note Accidental discharge wil...

Страница 18: ...nister to the Pyrorack by inserting the plug and tightening the washer 5 Reinsert the canister back into the Pyroack 6 Place the Pyrorack into position top of the Zellabox 7 3 Commissioning Steps 1 Fi...

Страница 19: ...1 and 2 by pressing the isolate zones buttons located on the front panel 3 A beeping sound will continue intermittently as a reminder 4 Once you have completed work within the MDC and you are ready t...

Страница 20: ...Warning Fire Suppression System Information 20...

Страница 21: ...issioning steps 7 7 Important tips Before working within the Zellabox ALWAYS ensure you follow these steps 1 Turn key switch to manual 2 Isolate both zones 1 and 2 by pressing the isolate zones button...

Страница 22: ...sted in the cooling system section as this will overheat the equipment The Zellabox Micro Data Centre is a PLUG N PLAY unit therefore once it has been installed by a qualified contractor the Micro Dat...

Страница 23: ...Zellabox Zellabox Pty Ltd PO Box 1035 Osborne Park DC Western Australia 6916 AUSTRALIA 1300 117 644 www zellabox com info zellabox com Version 2014 011 23...

Отзывы: