22
2.
Follow
Pyrorack
Commissioning
steps
from
the
installation
manual.
3.
Populate
the
Micro
Data
Centre
with
your
critical
equipment and add equipment labeling
in PDView.
NOTE:
Ensure
adequate
gaps
are
left
between
the
equipment
housed
within
the
Micro
Data
Centre
to
ensure
an
effective
air-flow
is
maintained.
The
cooling
system
will
maintain
the
optimal
cooling
air-flow
between
the
equipment
if
this
recommendation
is
adhered to.
NOTE: DO NOT exceed the cooling system’s
recommended BTU/h specifications (listed
in the cooling system section) as this will
overheat the equipment.
The Zellabox Micro Data Centre is a PLUG N
PLAY unit therefore once it has been installed
by a qualified contractor the Micro Data
Centre is ready for use!
1.
Follow these steps to start up your unit:
•
Start-up the switchboard
•
Switch Mains Isolator switch to the ON
position
•
Switch Cooling System switch to the ON
position only when the cooling system has
been commissioned
. Leave in the OFF
position until the air con contactor has
installed.
•
Switch UPS switch to the ON position
•
Switch all remaining switches to the ON
position
Zellabox
Start-up
procedure
8 Start-up
and ready for population
REFER TO USER MANUAL FOR FURTHER INFORAMTION
Содержание Cubb
Страница 1: ...1 Zellabox Installation Manual...
Страница 20: ...Warning Fire Suppression System Information 20...