background image

EN - 6 

1.2.1 Safety measures

Always observe the local building, safety and installation guidelines of the municipality, utility 
companies or other authorities.

Lift or move the unit according to the local safety regulations. The ComfoClime weighs 
around 60kg.

The installation of the unit hanging on the wall is not permitted.

Always connect air ducts with a minimum length of 900 mm to the unit before connecting the 
power supply to prevent contact with the internal components.

After installation, all parts that could lead to personal injury are safely out of reach behind 
the casing. 

It is not permitted to modify the unit or any of the specifications contained in this document. 
This may result in personal injury or reduced ventilation system performance.

Installation, commissioning and maintenance must be carried out by a certified person or 
company, unless stated otherwise. If this work is carried out by unauthorised persons, it may 
result in personal injury or reduced performance of the ventilation system.
Always disconnect the power supply of the unit before you start working on it. The unit can 
cause personal injury when it is opened during operation. Make sure the unit cannot be 
switched back on by accident.

Always take ESD-inhibiting measures when dealing with electronics, such as wearing an 
antistatic wristband. The electronics can be damaged by static charges.

In case of failure of the heat pump circuit please do not intervene, but please call the Zehnder 
Service.

The unit contains R32 refrigerant gas. This is a low-flammable, non-toxic refrigerant. Handle 
the unit with the utmost care during installation or maintenance activities to prevent refrigerant 
from leaking. Anyone involved in maintenance, repair or recycling of the product should wear 
gloves and eye protection all the time.

Operations over the refrigeration circuit is not allowed. 

In case of failure or leakages please 

call the Zehnder Service for support.

If refrigerant leaks due to a defect or damage, then:

•  Open windows and doors in the room in which the unit is located for at least one hour.

The unit contains 0.65kg (at room temperature approx. 0,6 m

3

) of R32 refrigerant gas.

The refrigerant is far heavier than air and it would concentrate on the floor and in case of 
leakage never try to contain the escaped gas and do not breath it in.
In the event of contact with skin or eyes, rinse for at least 20 minutes with lukewarm water 
and contact your doctor.
Product end of life: when disposing of the unit, contact your local authority to enquiry which 
are the possibilities for recycling or processing. The unit contains R32 refrigerant gas. It is 
mandatory that the refrigerant is disposed of in an environmental friendly manner: if not the 
contribution to greenhouse gas emissions of the volume of gas in this unit equals to 438 kg 
of CO

2

.

Flammable gas risk hazard!

Unit under pressure risk hazard!

Содержание ComfoClime 24

Страница 1: ...ComfoClime 24 ComfoClime 36 Installer Manual Decorative radiators Comfortable indoor ventilation Heating and cooling ceiling Clean air solutions...

Страница 2: ...ns 8 2 3 Installation conditions 9 2 4 Installation of the ComfoClime 10 2 4 1 Transport and unpacking 10 2 4 2 Checking the delivery 10 2 5 Configuration of the unit 12 2 6 Installation procedure 12...

Страница 3: ...s a result the ComfoClime 24 or ComfoClime 36 may slightly differ from the descriptions NOTE this manual has been compiled with the utmost care However no rights can be derived from it In addition we...

Страница 4: ...declaration and warranty 1 1 1 Identification plate The ComfoClime has a CE and UKCA marking on the identification plate The identification plate can be found on the front of the ComfoClime CAUTION I...

Страница 5: ...een designed and manufactured for use in balanced ventilation systems Any other use is deemed as an unintended use and can lead to damage to the ComfoClime or personal injury for which the manufacture...

Страница 6: ...ics can be damaged by static charges In case of failure of the heat pump circuit please do not intervene but please call the Zehnder Service The unit contains R32 refrigerant gas This is a low flammab...

Страница 7: ...supply plug 4 rubber ring gaskets 1 condensation drain cap 2 EPP standoffs 1 white plastic front cover 1 quick user guide 1 ComfoNet cable 1 kit for wall fastening with screws 1 DN32 PP bend CC24 175...

Страница 8: ...pact DN160 215 mm ComfoPipe Compact DN200 Diameter of condensation drain 32 mm 32 mm Material specifications Casing Coated metal sheet Coated metal sheet Internal structure Insulated metal sheet Insul...

Страница 9: ...oom around the unit for air duct connections intake and exhaust piping and in order to carry out the installation Keep at least 1 metre free in front of the unit and 25 cm to the side where the conden...

Страница 10: ...s when transporting and unpacking the ComfoClime unit Only transport it in an upright position Keep it upright when unpacking it Make sure the packing material is disposed of in an environmentally fri...

Страница 11: ...11 EN 2 EPP standoffs 4 rubber gaskets Wall bracket DN32 PP bend Wiring group...

Страница 12: ...o interference e g testing low voltage interface LAN digital or analogue signal Make sure interfering and sensitive cables cross each others perpendicularly Ensure that the cables used for the control...

Страница 13: ...g steps Step Action 1 Make sure that the ComfoAir Q is properly placed in its final position see the ComfoAir Q installation manual 2 Put the two EPP standoffs on the top part of ComfoAir Q as shown i...

Страница 14: ...hile installing NOTE during the placement of the ComfoClime on top of the ComfoAir Q remember to arrange the power supply cord so that it will exit from the back of the unit 6 Connect the free end of...

Страница 15: ...til the green LED on the right of the rotary switch starts blinking Now it is possible to release the RESTORE button The soft reset is equivalent to turning off the unit or unplug it The factory reset...

Страница 16: ...d the two on the bottom mount the black top front cover B pushing gently the four pins into the housing B A 10 Connect the preferred drain ending placed on the lateral side to the water drain system a...

Страница 17: ...llation setting the drainage system will be different as shown in the following pictures Installation with CAQ HRV standard exchanger Installation with CAQ ERV enthalpy exchanger an open funnel might...

Страница 18: ...Failure to comply with the safety regulations instructions warnings and comments may lead to personal injury or damage to the unit Proceed with the installation of the air ducts according to the follo...

Страница 19: ...7 XP103 CN5 CN10 CN14 CN7 DISPLAY CN11 OUT FAN CN9 DC IN FAN CN7 FAN POWER CN6 5V SCK DI0 GND RT IPT RT IPT OT OPT OT OPT TS TS TX RX GND 5V 12V FG VSP 15V GND 310V 15V IF PMW IF FG 310V GND 15V GND G...

Страница 20: ...rol app The supply air temperature is automatically determined by the ComfoClime accordingly to the outdoor conditions and the chosen comfort profile In cooling mode the ComfoClime doesn t control the...

Страница 21: ...l a Zehnder Authorised Representative On the upper part of the front cover behind the black transparent panel a couple of LEDs indicating the actual working mode of the unit are visible The possible c...

Страница 22: ...issioning procedure on the CAQ 31 HP board Heatpump board communication error Tryt rebooting the system or if not sorted out Call Zehnder Service 32 HP board Clime supply temperature probe failed Call...

Страница 23: ...23 EN PAGE INTENTIONALLY LEFT BLANK...

Страница 24: ...Zehnder Installer Manual_REV00 11 2022_Subject to change...

Отзывы: