background image

Page

 7 

EBS 

FIRST STAGE WITH ON/OFF KNOB INSTRUCTIONS

The 

first

 stage regulator with an integrated 

on/off knob

 is 

illustrated below. The unit must be in the on position 

or turned fully in the counterclockwise direction until aligned with green zone and arrow. 

To turn off, rotate clockwise until the red zone is aligned with the arrow. 

See instructions for use in EBS Deployment section of this manual. 

EBS 

User 

Manual

ZE.01.05.0031 REV. A

  The ON/OFF port of the integrated valve and first stage must always be in the ON position any 

time the EBS is in service and ready to be deployed.  If the valve has been closed to the OFF position at any 

time, it must be fully reopened to the ON position by rotating counterclockwise at least one full revolution 
before it is acceptable for use.  DO NOT place the unit into service without ensuring it is in the ON position. 

Failure to ensure unit is in the ON position will render the EBS incapable of delivering air to the user. 

ON POSITION

OFF POSITION

Содержание DEFENDER EBS 207

Страница 1: ...ual Page 1 ZEAGLE DEFENDER EBS EMERGENCY BREATHING SYSTEM USER MANUAL Huish Outdoors Part PN 350 9200 ZEAGLE DEFENDER EBS 207 BAR SYSTEM PN 350 9210 ZEAGLE DEFENDER EBS 207 BAR SYSTEM w ON OFF ZE 01 0...

Страница 2: ...Page 2 EBS User Manual ZE 01 05 0031 REV A...

Страница 3: ...EBS is considered a Emergency Self Contained Emergency Underwater Breathing Apparatus A such the EBS is designed for user deployment and operation with sufficient notice given to the user to deploy t...

Страница 4: ...able ease of use and maintenance Additional features that include adjustable mouthpiece positions a flexible hose with swivel connections and convenient port connections provide desirable options for...

Страница 5: ...his manual and mastering the skills necessary to operate inspect and maintain it properly Failure to do so could result in a situation whereby the EBS would not be an available resource to assist with...

Страница 6: ...or and valve is threaded into the cylinder to provide a compact assembly It is provided with an onboard pressure gauge an ON OFF port or knob aassembly fill port and low pressure hose with a swivel co...

Страница 7: ...anual EBS User Manual ZE 01 05 0031 REV A The ON OFF port of the integrated valve and first stage must always be in the ON position any time the EBS is in service and ready to be deployed If the valve...

Страница 8: ...with the user s mouth and supply air on demand for breathing See instructions for use in EBS Deployment section of this manual The second stage assembly also provides a location for storage of a nose...

Страница 9: ...NCY SITUATION 1 Use one hand to secure your position at the nearest exit escape route Use your free hand to grasp the EBS second stage regulator and pull out and away from your body to ensure hose is...

Страница 10: ...air flow ceases allowing you to comfortably exhale Air flow to you can be manually activated anytime by pressing the purge feature as long as there is a remaining air supply in the cylinder 5 After y...

Страница 11: ...d properly could create a hazard with a possible risk of serious injury or death Before connecting the Fill Adapter to the Male QD observe the following information When compressed air is introduced i...

Страница 12: ...e a full charge Exceeding the maximum pressure and fill rate could result in damage to the EBS and create a hazardous condition with the possibility of serious injury or death To Fill the EBS cylinder...

Страница 13: ...freshwater to remove sea salt and other contaminates Be sure mouthpiece and exhaust valves are included in flushing operation Following rinsing dip the second stage in a sanitizing bath as prescribed...

Страница 14: ...inder if less than 2 in diameter and less than 12 in length is excepted from volumetric expansion test However the cylinder must be taken out of service if it has been exposed to a temperature greater...

Отзывы: