Page
1
2
Do not exceed
the
maximum working pressure
of the EBS at
207
bar
(
3000
PSI)
for any reason. Use the fill station pressure gauge to monitor cylinder pressure as it is generally more
precise than the EBS on board gauge. Cylinder pressure and filling rate must be constantly monitored
to ensure the maximum working pressure is not exceeded.
Slow filling at a rate not to exceed 28 bar per minute is preferred.
According to the cylinder manufacturer, fast filling is acceptable provided the cylinder is well maintained
and undamaged and the fill rate does not exceed 30 L per minute. For the EBS this is equivalent to a
maximum compression rate of 94 bar (1350 PSI) per minute, requiring less than 3.5 minutes to achieve
a full charge.
Exceeding the maximum pressure and fill rate could result in damage to the EBS and create a
hazardous condition with the possibility of serious injury or death.
To Fill the EBS cylinder perform the following procedure:
1. Remove the Fill Port Cap turning counterclockwise.
2. Inspect the fill port passage and remove any moisture, corrosion or debris.
3. Insert the Male QD adapter of the Filler Adapter assembly into the EBS fill port turning
clockwise by hand until snug.
4. Operate the valve located on the compressor fill whip to begin introduction air into the
cylinder. Slowly fill the cylinder.
5. After filling is complete, close the fill whip control valve, open the bleed screw to remove
residual pressure and operate the Female QD to separate the Fill Adapter from the EBS.
6. Remove the Male QD Adapter from the Fill Port. Replace the Fill Cap and tighten until snug.
EBS
User
Manual
ZE.01.05.0031 REV. A
Содержание DEFENDER EBS 207
Страница 2: ...Page 2 EBS User Manual ZE 01 05 0031 REV A...