
Z402C System User Manual
Z Corporation
5.2 DEPOWDERING THE PART
1. Place parts inside depowdering unit.
2. Using the compressed air system included in
the Depowdering Station, remove any excess
powder that remains in any concave surfaces.
TECHNICAL TIPS….
The air pressure on your Depowdering Station is adjustable. For bulky parts, turn the air
pressure up. For more delicate parts, turn the air pressure down.
5.3 DRYING THE PART
To infiltrate parts with wax, the parts must be hot and dry. Preheat part at 165 degrees Fahrenheit in
the Automated Waxer or in a drying oven, remembering that drying time and part wall thickness are
directly related. If the average wall thickness is ¼”, then the part should be in the drying oven for
fifteen minutes. If average wall thickness is ½” inch, the part should be in the drying oven for ½ hour.
Use the chart below as a guide.
Average Wall Thickness
Drying Time
1/8 inch
8 minutes
1/4 inch
15 minutes
1/2 inch
30 minutes
1 inch or greater
60 minutes
For instructions on how to use the Automated Waxer, please refer to the Waxer User Manual.
www.zcorp-users.com
33