Filling the Verometer
Figure 199
Refer to the Filling the Verometer Operational Sche-
matic figure 199, on page 79.
1. Close valve V2, V3, and V5
2. Open valve V4 until gauge reads 25 psi (1.72 Bar)
and then close V4.
3. Open valve V17
4. Place the NJEX System in Standby mode by
pressing the Standby key on the front of the N-300
controller. The Standby LED indicator will begin to
flash on and off.
5. Scroll to the Meter Level display on the N-300
controller and select *Fill.
6. Press Standby key to reactivate normal operation.
The Verometer will begin to fill.
7. Proceed to the Prime & Start procedure of
page 80
.