4-22
2 . Loading precaution
1)
When loading or unloading the
machine, park the trailer on a
flat, firm road. Keep a fairly
long distance between the road
shoulder and the machine.
2)
Properly apply the brakes on
the trailer and insert blocks
beneath the tires to ensure that
it does not move.
3)
Make the angle of the gangplank a maximum of 15°. Set the distance
between the ramps to match the centre of the tracks.
4)
Let the excavator and the ramp in the line, the bulldozer stay in the
backside, for safety reason, the excavator should drive slowly when
climbing the ramp until reach to the end of the ramp.
Attention: when you are on the slops don’t operate any other
fountions besides the travel.
5)
Set in direction of the ramps, then
stop walking to extend the arm (B),
enable the front of crawler load the
trailer’s floor. Lower the work
equipment for fear it hitting the
trailer, then travel slowly to load or
unload the machine correctly in
the specified position on the
trailer.
6)
Lower down the arm slowly and make the bucket contact with floor,
then lower down the blade, load the machine correctly in the
specified position on the trailer.
Attention: Choose the trailer to match the machine in weight and
size offered in this manual
WARNING: After completing work or operating, before
leave the seat, the operator should lift the safety lock lever
at first to make the pilot operating oil circuit is cut off. For
in case that somebody impact the operating lever
accidentally what cause the machine move.
Содержание YC60-9
Страница 1: ......
Страница 47: ...3 3 A Instrument Display ...
Страница 48: ...3 4 ...
Страница 54: ...3 10 Left control box switch panel AC control panel see AC control section ...
Страница 109: ...5 8 Oil capacity Sort Unit Value Fuel tank L 102 Engine oil L 7 6 Hydraulic oil tank L 76 ...