5-38
Lubricate
Lubricating every 50 hours
Lubricating steps:
1) Start the machine and place the bucket on the ground
2) Put the bulldozer down to the ground
3) Stop the engine
4) Clean the nipples and the oil cup.
5) Lubricating the parts and wipe nipples.
1. panel point of arm and bucket 11. Panel point of boom and platform
2.
panel point of Linkage rod and bucket 12. Panel point of dozer and chassis
3. panel point of Linkage rod and connected rod 13. Lubricating point on the end of
4. panel point of Linkage rod and arm dozer cylinder
5. lubricating point on the end of bucket cylinder 14. Lubricating point on the head of
6. lubricating point on the head of arm cylinder dozer cylinder
7. panel point of arm and boom 15. Rollaway lubricating point I
8. lubricating point on the end of arm cylinder 16. Rollaway lubricating point II
9. lubricating point on the head of boom cylinder 17. Rollaway lubricating point III
10. lubricating point on the end of boom cylinder
Содержание YC60-9
Страница 1: ......
Страница 47: ...3 3 A Instrument Display ...
Страница 48: ...3 4 ...
Страница 54: ...3 10 Left control box switch panel AC control panel see AC control section ...
Страница 109: ...5 8 Oil capacity Sort Unit Value Fuel tank L 102 Engine oil L 7 6 Hydraulic oil tank L 76 ...