![York YLAA0041 Скачать руководство пользователя страница 109](http://html1.mh-extra.com/html/york/ylaa0041/ylaa0041_manual_4227837109.webp)
JOHNSON CONTROLS
109
SECTION 5 – TECHNICAL DATA
FORM 150.72-ICOM6
ISSUE DATE: 08/03/2022
55
INSTALLATION OF NEOPRENE VIBRATION ISOLATORS
LD13762B
D
D
TOP BOLT
CL
SECTION D-D
TOP WASHER
("A")
("B")
CL
("C")
("B")
1. Read instructions in their entirety before begin-
ning installation.
2. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal draw-
ings or as otherwise recommended.
3.
Set isolators on floor, housekeeping pad, or sub-
base, ensuring that all isolator centerlines match
the equipment mounting holes. The VMC group
recommends that the isolator base (“A”) be in-
stalled on a level surface. Shim or grout as re-
quired, leveling all isolator bases to the same
elevation (1/32 in. maximum difference can be
tolerated).
4. Bolt or anchor all isolators to supporting structure
utilizing base hrough holes (“B”).
5. Remove top bolt and top washer. Place equip-
ment on top of isolators so that mounting holes
in equipment or base line up with threaded hole
(“C”).
6. Reinstall top bolt and washer and tighten down.
7. Installation is complete.
Содержание YLAA0041
Страница 10: ...JOHNSON CONTROLS 10 FORM 150 72 ICOM6 ISSUE DATE 08 03 2022 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 150 72 ICOM6 ISSUE DATE 12 18 2020 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 32: ...JOHNSON CONTROLS 32 FORM 150 72 ICOM6 ISSUE DATE 08 03 2022 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 110: ...JOHNSON CONTROLS 110 FORM 150 72 ICOM6 ISSUE DATE 08 03 2022 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 122: ...JOHNSON CONTROLS 122 FORM 150 72 ICOM6 ISSUE DATE 08 03 2022 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 174: ...JOHNSON CONTROLS 174 FORM 150 72 ICOM6 ISSUE DATE 08 03 2022 THIS PAGE IS INTENTIONALLY LEFT BLANK...