101
YORK INTERNATIONAL
FORM 201.18-NM1 (102)
The subcooling temperature of each system should be
calculated by recording the temperature of the liquid
line at the outlet of the condenser and subtracting it
from the recorded liquid line pressure at the liquid stop
valve, converted to temperature from the temperature/
pressure chart.
Example:
Liquid line pressure =
202 PSIG converted to
102°F (39°C)
minus liquid line temp.
- 87°F (31°C)
SUBCOOLING =
15°F (8°C)
The subcooling should be adjusted to 12 - 15°F (7 - 8°C).
q
1. Record the liquid line pressure and its corre-
sponding temperature, liquid line temperature
and subcooling below:
SYS 1
SYS 2
Liq Line Press =
PSIG (kPa)
Temp =
°F
(°C)
Liq Line Temp =
°F
(°C)
Subcooling =
°F
(°C)
After the subcooling is set, the suction superheat should
be checked. The superheat should be checked only af-
ter steady state operation of the chiller has been estab-
lished, the leaving water temperature has been pulled
down to the required leaving water temperature, and
the unit is running in a fully loaded condition. Correct
superheat setting for a system is 10 - 12°F (6 - 7°C).
The superheat is calculated as the difference between
the actual temperature of the returned refrigerant gas
in the suction line entering the compressor and the tem-
perature corresponding to the suction pressure as shown
in a standard pressure/temperature chart.
Example:
Suction Temp =
46°F (8°C)
minus Suction Press
60 PSIG converted
to Temp
- 34°F (1°C)
12°F (7°C)
The suction temperature should be taken 6" (13 mm)
before the compressor suction service valve, and the
suction pressure is taken at the compressor suction ser-
vice valve.
INITIAL START-UP
After the control panel has been programmed and the
compressor heater has been on for 24 hours prior to
start-up, the chiller may be placed into operation.
q
1. Place the System Switches on the Micropro-
cessor Board to the ON position.
q
2. The compressor will start and a flow of refrig-
erant will be noted in the sight glass. After sev-
eral minutes of operation, the bubbles in the
sight glass will disappear and there will be a
solid column of liquid when the TXV stabilizes.
After the water temperature stabilizes at desired
operating conditions, the oil should be clear.
q
3. Allow the compressor to run a short time, being
ready to stop it immediately if any unusual noise
or adverse conditions develop. Immediately at
start-up, the compressor will make sounds dif-
ferent from its normal high-pitched sound. This
is due to the compressor coming up to speed
and lubrication changing from liquid refriger-
ant to oil. This should be of no concern and lasts
for only a short time.
q
4. Check the system operating parameters. Do this
by selecting various displays such as pressures
and temperatures. Compare these to test gauge
readings.
CHECKING SUBCOOLING AND SUPERHEAT
The subcooling should always be checked when charg-
ing the system with refrigerant and/or before setting
the superheat.
When the refrigerant charge is correct, there will be no
bubbles in the liquid sight glass with the system oper-
ating under full load conditions, and there will be 10 -
15°F (6 - 8°C) subcooled liquid leaving the condenser.
An overcharged system should be guarded against. Evi-
dences of overcharge are as follows:
a.
If a system is overcharged, the discharge pressure
will be higher than normal. (Normal discharge/con-
densing pressure can be found in the refrigerant tem-
perature/pressure chart; use entering air temperature
+30°F (17°C) for normal condensing temperature.
b. The temperature of the liquid refrigerant out of the
condenser should be not be more than 15°F (8°C)
less than the condensing temperature (The tempera-
ture corresponding to the condensing pressure from
the refrigerant temperature/pressure chart).
7
Содержание MILLENNIUM YCAS0230
Страница 45: ...45 YORK INTERNATIONAL FORM 201 18 NM1 102 This page intentionally left blank 7 ...
Страница 61: ...61 YORK INTERNATIONAL FORM 201 18 NM1 102 WIRING DIAGRAM WYE DELTA START FIG 21 CONT D LD03229 7 ...
Страница 67: ...67 YORK INTERNATIONAL FORM 201 18 NM1 102 LD03282 LD03283 LD03284 FIG 25 DETAIL A see pages 56 57 7 ...
Страница 69: ...69 YORK INTERNATIONAL FORM 201 18 NM1 102 COMPRESSOR TERMINAL BOX LD03233 FIG 29 COMPRESSOR TERMINAL BOXES 7 ...
Страница 70: ...70 YORK INTERNATIONAL FORM 201 18 NM1 102 Technical Data FIG 30 DETAIL B LD03285 ...
Страница 95: ...95 YORK INTERNATIONAL FORM 201 18 NM1 102 COMPRESSOR COMPONENTS CONT D FIG 43 COMPRESSOR COMPONENTS LD03670 7 ...
Страница 166: ...166 YORK INTERNATIONAL FORM 201 18 NM1 102 ...
Страница 167: ...167 YORK INTERNATIONAL FORM 201 18 NM1 102 ...