
Pre-Installation Preparation
Before starting conveyor installation,
study
this entire manual
and any other applicable
documents, including, but not limited to, OSHA
regulations and the National Electric Code.
Distribute the parts in an orderly fashion at the
construction site to facilitate later assembly.
Receiving Inspection
The conveyor has been carefully checked before
shipment. Carefully inspect the shipment and
all components. Use the packing list provided
with the shipment to verify that all parts have
been received. Any discrepancies should be
clarified immediately. Please remember that any
damaged or missing parts must be noted on the
bill of lading at the time of delivery. Report any
damage or shortage to the delivering carrier
as soon as possible. MFS/YORK/STORMOR’s
responsibility for damage to the equipment ends
with acceptance by the delivering carrier.
Pre-Assembly
Bolt Head Identification
Grade 2
Grade 5
Grade 8
Grade 8.2
Bolt
Diameter
-
Threads/Inch
Grade 2
Grade 5
Grade 8 and 8.2
P
T
P
T
P
T
ft-lb
Nm
kgf-m
ft-lb
Nm
kgf-m
ft-lb
Nm
kgf-m
1/4”
- 20
1313
6
8.1
0.83
2000
9
12
1.2
2850
13
18
1.8
5/16”
- 18
2176
12
16
1.7
3350
19
26
2.6
4700
27
37
3.7
3/8”
- 16
3188
22
30
3.0
4950
34
46
4.7
6950
48
65
6.6
7/16”
- 14
4388
35
47
4.8
6800
55
75
7.6
9600
77
104
11
1/2”
- 13
6850
63
85
8.7
9050
83
110
11
12800
120
163
17
5/8”
- 11
9300
110
150
15
14500
170
230
24
20300
230
312
32
3/4”
- 10
11400
160
217
22
21300
290
390
40
30100
410
556
57
7/8”
- 9
13800
220
298
30
29500
470
640
65
41600
670
910
93
1”
- 8
15000
280
380
39
38700
710
960
98
54600
1000
1400
138
coarse thread bolts
Bolt Torque Values
Use the torque values listed in the table above for all drag conveyor
connections!
Bolt Torque
25
GLOBAL
INDUSTRIES, INC.
Drag Conveyors
10230011
2016-06-14