<2. Installation>
2-3
IM 12Y18A04-01EN
1st Edition : Oct. 04, 2019-00
NOTE
The enclosure drain produces no waste under normal use. However, in the event of spills or
leaks, some waste may be produced.
The analyzer is shipped with all of the internal tubing attached. Before starting up the instrument,
verify that the tubing lines are secured.
Figure 2.3 Internal tubing and tube routing interconnections
2.2.1
Installing Peristaltic Pump Head Tubing
Press the STOP key.
Disengage the U shape pressure plate of the pump head assembly by pressing with two fingers
and gently move upside as shown in Figure 2.4. Slide the tube fitting retainers at each side.
Replace the old tube by sliding off the barbed fitting. If necessary, clean the pump rollers.
Lubricate the tubing with pea-sized quantity of silicone oil which should be purchased separately.
Fit the new tube and replace in the pressure plate. Note that the pressure plate sides must click
properly in the pump head assembly and align on both sides.
Repeat above steps for all pumps.
You can test the pump under Diagnostics menu for proper operation:
MENU → SERVICES → DIAGNOSTICS → PUMPS & STIRRER
Содержание WE440
Страница 1: ...User s Manual Model WE440 Phosphate Analyzer IM 12Y18A04 01EN IM 12Y18A04 01EN 1st Edition ...
Страница 9: ...Blank Page ...
Страница 25: ...Blank Page ...
Страница 33: ...Blank Page ...
Страница 41: ...Blank Page ...
Страница 63: ...Blank Page ...
Страница 67: ...Blank Page ...