31
Precision Making
Setup
19. Phase measurement between 2 channels
ScopeCorder introduction workbook
Copyright © Yokogawa Electric Corporation
Prerequisite:
Acquire two 60
⁰
phase shifted waveforms on CH1 and CH2, at 5ms/DIV
In this advanced exercise you will setup a Phase Measurement between the two acquired waveforms. Steps are
somewhat abbreviated.
Follow these keystrokes:
DONE!
Results are displayed
on the next page.
Channel delay
In order to perform this exercise with a
DL850E(V) only, you can also connect CH 2 to
PROBE COMP and add a delay to the channel.
To do this: Press the
CH 2
button » Select
Filter
Delay Setup
» set a delay of
166μs