I N S TA L L AT I O N   M E T H O D

1. Mounting hole installation (fixed bracket)

Type

Mechanical load (Pa)

Safety factor

Schematic diagram

Purlin perpendicular to 

long-side frame

+3600

- 1600

1.5

Purlin parallel to 

long-side frame

+1600

 - 1600

1.5

Notes:

•  To maximize mounting longevity, Yingli Solar strongly recommends the use of corrosion proof (stainless steel) attachment hardware.

•  To check whether the surface of the beam is flat and smooth, or add rubber pads on the beam to prevent the module from being crushed when it is pressed down.

•  Parts in contact with the modules should use flat stainless steel washers of minimum 1.4 mm thickness with an minimum outer diameter of 15.57 mm.

•  Modules can be attached using the mounting holes (2 holes of φ9×14 mm of one long-side frame, 

 1300 mm spacing) on the back of the module frame, by fixing the module to the 

support rails with bolts.

•  Secure the module in each mounting location with M8 bolts and matching flat washers, spring washers and nuts, and tighten to a torque of 14~20 N∙m. The tightening steps as follows: 

use torque wrench to tighten nut to target torque, nut loosen 90~180 degrees, finally tighten the nut to the target torque and reduce the torque attenuation.

2. Mounting hole installation (1P tracker)

Type

Mechanical load (Pa)

Safety factor

Schematic diagram

Purlin parallel to 

long-side frame

+1600

 - 1600

1.5

Notes:

•  To maximize mounting longevity, Yingli Solar strongly recommends the use of corrosion proof (stainless steel) attachment hardware.

•  Parts in contact with the modules should use flat stainless steel washers of minimum 1.4 mm thickness with an minimum outer diameter of 15.57 mm.

•  Modules can be attached using the mounting holes (2 holes of φ7×10 mm of one long-side frame, 400 mm spacing for special tracker, or 2 holes of φ9×14 mm of one long-side frame, 

spacing 

 L/3, L represents the length of the long side of the module) on the back of the module frame, by fixing the module to the support rails with bolts.

•  Secure the module in each mounting location with 2 M6 bolts or 2 M8 bolts, and matching flat washers, spring washers and nuts, and tighten to a torque of 14~20 N∙m. The tightening 

steps as follows: use torque wrench to tighten nut to target torque, nut loosen 90~180 degrees, finally tighten the nut to the target torque and reduce the torque attenuation.

Содержание YLM-J 3.0 PRO Series

Страница 1: ...tification requirements has been verified by an independent certification laboratory This Installation and User Manual is available in different languages In cases of discrepancy between versions the English language version shall control Failure to comply with the requirements listed in this manual will invalidate the Limited Warranty for PV Modules as provided by Yingli Solar at the time of sale...

Страница 2: ...ules in any way Doing so may degrade performance or cause irreparable damage and will void any applicable warranties If it is necessary to store PV modules prior to installation the PV modules should remain inside the packaging and protected from exposure that could compromise the durability of the packaging Fire Yingli Solar PV Modules have a Class C fire resistance rating in accordance with the ...

Страница 3: ...cross sectional areas that are approved for use at the maximum short circuit current of the PV module Yingli Solar recommends installers use only sunlight resistant cables qualified for direct current DC wiring in PV systems The minimum wire size should be 4mm2 Table 1 Required minimum field wiring specifications Testing Standard Wire Size Temperature Rating Required Minimum Field Wiring EN 50618 ...

Страница 4: ...sult in galvanic corrosion An addendum to UL Standard 1703 Flat Plate Photovoltaic Modules and Panels recommends metal combinations not exceed an electrochemical potential difference of 0 5 Volts The frame rails have pre drilled holes marked with a grounding sign as illustrated in Figure 8 These holes should be used for grounding purposes and must not be used for installation the PV modules Do not...

Страница 5: ...n attachment Figure 12 Installation rails The large size modules are mounted with four outer holes with max mechanical loads of 5400 Pa snow front and 2400 Pa wind back Top down Clamps Third party clamps that have been designed for PV installation structures are an approved installation attachment method for Yingli Solar PV modules Modules must be fastened using clamps applied to the top side of t...

Страница 6: ...rasive materials that could scratch or damage the glass surface Failure to comply with these requirements may adversely affect the PV module performance Yingli Solar PV modules are designed to withstand high snow loads However if removing snow is desired to enhance production use a brush to gently remove snow Do not try to remove frozen snow or ice from PV modules DECOMMISSIONING The dismantling o...

Страница 7: ...racteristics are within 10 percent of the indicated values of Isc Voc and Pmax under Standard Test Conditions irradiance of 1000 W m2 AM 1 5 spectrum and a cell temperature of 25 C Refer to module datasheets for specific power output tolerances Please refer to Table 1 to see which power classes actually exist for which module series Family YLM J 3 0 PRO Type YLxxxD 37e 1 2 xxx 390 415 YLxxxD 37e 1...

Страница 8: ...4 20 N m The tightening steps as follows use torque wrench to tighten nut to target torque nut loosen 90 180 degrees finally tighten the nut to the target torque and reduce the torque attenuation 2 Mounting hole installation 1P tracker Type Mechanical load Pa Safety factor Schematic diagram Purlin parallel to long side frame 1600 1600 1 5 Notes To maximize mounting longevity Yingli Solar strongly ...

Страница 9: ...ashers of minimum 1 4 mm thickness with an minimum outer diameter of 15 57 mm Modules can be attached using the mounting holes the number of mounting holes used for a single long side frame 2 including at least one φ7 10 mm hole on the back of the module frame by fixing the module to the support rails with bolts Secure the module in each mounting location with M6 and M8 bolts and matching flat was...

Страница 10: ... when it is pressed down L represents the length of the long side of the module the described distances are from the module edge to the middle of the clamp The long side frames of the module are fixed to the mounting beam or rail by at least 4 clamps that can be fitted with M8 bolts The length of the clamp 40 mm and the module frame to maintain at least 7 mm but not more than 10 mm overlap part co...

Страница 11: ...es are required to secure the modules to the forklift with a tensile strength greater than 2000 kgf 2 Pass the forearm of the anti tilting bracket through the pallet insert the two bolts into the front round hole of the anti tilting bracket and adjust the support angle of the anti tilting bracket so that the angle with the ground is between 80 and 87 3 When placing it need to wait for the packing ...

Отзывы: