(b) Install the module in the cabinet and tighten the
mounting screws.
(c) Insert all modules in line with the guide of the NC
rack and tighten mounting screws (NC rack) .
(d) Insert all the cables into the original positions.
(3)
Checking Functions After Replacement
(a) Check that
and
outputs are not
shorted due to overloading.
(b) Apply the first power and second power again and
check that no alarm occurs.
● ✎
FC200
and
(FILE: optional) boards are
provided with CMOS RAM (programs, parameters and
offset data) and with backup by super capacitor.
Therefore, installation must be completed within 16
hours after removal of the boards.
181
Содержание YASNAC i80
Страница 3: ...YASNAC i80 CNC SYSTEM FOR MACHINE TOOLS MAINTENANCE MANUAL v YASUAW14 ...
Страница 26: ...1 2 COMPONENTS Cent d 16 14 ACGC Operation Panel Model JZNC IOP1l E u v d 1 2 0 a L ...
Страница 30: ... I A om o amvr _ fi___ n ___ __n__n WI c ___________ ...
Страница 31: ... M o d e l JAN CD FC190 1 Approx mass 0 32 kg M o d e l JAN CD FC200 Approx mass 0 3 kg be _____ _ _ _ __ a 21 ...
Страница 35: ... Model JAN CD FC31O 1 Spindle control 1 axis Approx mass 0 24 kg 4 q ___ _ _ __ R x a FC31 O L 25 ...
Страница 41: ... Model JANCD FC260 I Ha Approx mass 0 34 kg 1 ...
Страница 45: ... rl v JANCD Fc050 1 B r 1 2 q 11 ...
Страница 206: ...196 ...
Страница 225: ... e Enter the desired pitch error number R f Depress the WRQ key The pitch error number is entered 215 I ...