( 2 ) C h e c k i n g f o r O p e n i n g a n d
Damage
(monthly)
( a )
Check gaskets on the rims
of front and rear doors.
Is the packing damaged?
(b) Check if the inside of en-
closure is dusty.
Clean it,
if necessary.
Dusty ?
Check for any opening in
the door base with the doors
shut tightly.
Is any opening found?
Constant execution of the
maintenance work described
above will keep YASNAC
i80 in optimum condition
for an extended period.
61
Содержание YASNAC i80
Страница 3: ...YASNAC i80 CNC SYSTEM FOR MACHINE TOOLS MAINTENANCE MANUAL v YASUAW14 ...
Страница 26: ...1 2 COMPONENTS Cent d 16 14 ACGC Operation Panel Model JZNC IOP1l E u v d 1 2 0 a L ...
Страница 30: ... I A om o amvr _ fi___ n ___ __n__n WI c ___________ ...
Страница 31: ... M o d e l JAN CD FC190 1 Approx mass 0 32 kg M o d e l JAN CD FC200 Approx mass 0 3 kg be _____ _ _ _ __ a 21 ...
Страница 35: ... Model JAN CD FC31O 1 Spindle control 1 axis Approx mass 0 24 kg 4 q ___ _ _ __ R x a FC31 O L 25 ...
Страница 41: ... Model JANCD FC260 I Ha Approx mass 0 34 kg 1 ...
Страница 45: ... rl v JANCD Fc050 1 B r 1 2 q 11 ...
Страница 206: ...196 ...
Страница 225: ... e Enter the desired pitch error number R f Depress the WRQ key The pitch error number is entered 215 I ...